Installing New Firmware

If required, upgrade the instrument to the latest ESG-B firmware.

Verifying the New Firmware

To verify the new firmware has been downloaded into the signal generator, press 

Utility

 > 

Instrument Info/Help Mode

 > 

Diagnostic Info

. The new firmware revision and firmware date should be 

displayed under “Instrument Information”.

Activating Options UN8 and UN9

1. Turn on the signal generator and allow it to warm up for at least 30 minutes.

2. Preset the signal generator.

3. Press 

Utility

 > 

Instrument Adjustments

 > 

Hardware Options

.

4. As when you removed Option UN3/UN4, the signal generator displays a list of hardware options. 

Highlight Options UN8 and UN9.

5. Press the 

Select Item

 softkey. An X is placed in the 

Selected

 column for both Option UN8 and UN9

6. To enable the selected options, press 

Proceed With Reconfiguration

, then press 

Confirm Change (Instrument 

will Reboot)

.

CAUTION

If you enable an option without the required hardware installed, only the menus for that 
option are activated; the option does not function.

Internally Recalibrating the Signal Generator

1. Preset the signal generator.

2. Press 

Utility

 > 

Instrument Adjustments

 > 

Hardware Options

. Confirm that an X appears in the 

Selected

 

column for UN8. If it does not, go to step 5 in the procedure above, “Activating Options UN8 and UN9”.

3. Select 

Calibrate Selected Items

 > 

Start Calibration and Store Results

.

The calibration takes about five minutes, during which, a message appears indicating that the calibration 
is in progress. The message also shows the progress of the calibration, as percent complete. When the 
calibration finishes, the message is replaced by the Hardware Options menu.

Содержание E4400-60767

Страница 1: ...0 90663 Printed in USA June 2008 Supersedes None Agilent Technologies ESG D Series Signal Generators Data Generator Assembly Replacement Kit Option UN3 UN4 to UN8 UN9 Kit Part Number E4400 60767 Model...

Страница 2: ...to this material including but not limited to the implied warranties of merchantability and fitness for a particular purpose Agilent Technologies shall not be liable for errors contained herein or fo...

Страница 3: ...tor with 8M of RAM The installation process consists of the following basic steps 1 verifying the functionality of the signal generator 2 removing Option UN3 or UN4 3 installing Option UN8 and UN9 4 i...

Страница 4: ...assemblies should be performed at a static safe workstation Item Quantity Description Part Number Std No Opts UN9 to UN7 UN9 to UND 1 1 1 1 Board Assembly Real time I Q Baseband Generator A7 E4400 600...

Страница 5: ...Utility Error Info The first error message in the queue is shown in the text area of the display Refer to the service guide for information about the error message If there is more than one error mess...

Страница 6: ...UN3 UN4 Removing Option UN3 UN4 Hardware 1 Turn off the line power switch on the signal generator and disconnect the line cord 2 Loosen the two screws on each handle and remove the two strap handles...

Страница 7: ...7 Figure 1 Cover Removal Figure 2 Option UN3 UN4 A7 Baseband Generator Board and Cables...

Страница 8: ...8 Figure 3 Option UND A5 Dual Arb Board and Cables Figure 4 Option UN7 A6 Bit Error Rate Test Board and Cables...

Страница 9: ...9 Figure 5 Option UN3 UN4 A8 Data Generation Board and Cables...

Страница 10: ...t panel to A14P6 on the motherboard 5 Connect W5 Symbol Sync from the front panel to A14P7 on the motherboard 6 Insert the W18 ribbon cable provided in this upgrade kit between the A17 ribbon cable in...

Страница 11: ...5 INT Q cable between the motherboard connector A14P103 and the A15 daughterboard and replace it with the W25 cable provided in this upgrade kit Figure 7 on page 12 NOTE A14P103 and A14P102 are locate...

Страница 12: ...12 Figure 6 Option UN8 UN9 Top View Figure 7 Cables W25 and W26...

Страница 13: ...anel to A7P404 I OUT W17 09 Rear Panel to A7P405 DATA W3 5 Front Panel to A14P5 SYMBOL SYNC W5 6 Front Panel to A14P7 DATA CLOCK W4 7 Front Panel to A14P6 Rear Panel Interface Cable W18 Rear Panel Int...

Страница 14: ...14 Figure 8 Options UN9 UN7 UND Top View...

Страница 15: ...ted column for both Option UN8 and UN9 6 To enable the selected options press Proceed With Reconfiguration then press Confirm Change Instrument will Reboot CAUTION If you enable an option without the...

Страница 16: ...gure 1 item 6 4 Replace the four rear feet and torque the four screws to 21 in lb Figure 1 items 4 and 5 5 Replace the two strap handles one on each side of the signal generator and torque the two scr...

Отзывы: