![Agilent Technologies 700 Series Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/agilent-technologies/700-series/700-series_user-manual_2867623017.webp)
Introduction
Agilent 700 Series ICP Optical Emission Spectrometers User’s Guide
17
2.
Introduction
Site Preparation Requirements
17
User Documentation
18
Environmental Conditions
19
Electrical Power Supplies
19
Other Connections
20
Gas Supplies
20
Water Cooling System
22
Drain Vessel
23
Site Preparation Requirements
Prior to receiving your instrument you will have been provided with
an Agilent 700 Series ICP Optical Emission Spectrometer Site
Preparation Guide, which describes the environmental and operating
requirements of the ICP-OES system. You must prepare your
laboratory according to these instructions before the ICP-OES can be
installed. You should keep the Site Preparation Guide for future
reference for example, if you plan to move your instrument. If you
have misplaced your copy, you can obtain a free replacement from
your local Agilent office.
Position the equipment for easy access to the disconnecting switch
on the rear of the instrument.