
Troubleshooting - 3
41
Initialization
The dc power supply's GPIB address and model number as well as other constants which are required to
program and calibrate the supply are stored in a EEPROM on the A2 Interface board. The Interface board
also contains references and other components that will affect the alignment of the supply. If the Interface
board is replaced, the supply must be reinitialized and calibrated. To initialize the power supply:
a.
Enable the Calibration mode.
b. Simultaneously depress the "0" and "1" keys.
c.
Using the Up/Down arrows select the appropriate model number.
d. Press "Enter".
The dc power supply will go through the turn-on self test sequence. It is now re-initialized and must be
calibrated. See Appendix A of the User’s Guide for the calibration procedure.
ROM Upgrade
Identifying the Firmware
You can use the *IDN? query to identify the revision of the supply's firmware. The query will readback
the revisions of the Primary Interface ROM located on the A2 Interface board. The manufacturer and model
number of the supply are also returned. The following is a sample program:
10
ALLOCATE L$[42]
20
OUTPUT 705;"*IDN?"
30
ENTER 705;L$
40
DISP L$
50
END
The computer will display the manufacturer's name, the model number, a "0," and then the firmware
revision. Example: "Agilent,66312A,0,A.00.01". The revision level of the ROM can also be found on the
label affixed to the physical IC chip itself.
Upgrade Procedure
If the Interface board ROM is upgraded you can re-initialize the supply without affecting the calibration.
a.
Enable the Calibration mode.
b.
Simultaneously depress the "0" and "1" keys. EEINIT <model> will be displayed.
c.
Using the Up/Down annunciator keys select ROMUPD <model>.
d.
Using the Up/Down arrows select the appropriate model number.
e.
Press "Enter".
The supply will go through the turn-on self test sequence and return to the power supply metering mode.
Содержание 6612B
Страница 8: ......
Страница 25: ...Troubleshooting 3 25 Figure 3 1 Sheet 3 Main Flowchart...
Страница 46: ......
Страница 49: ...Principles of Operation 4 49 Figure 4 1 A2 A3 Block Diagram...
Страница 51: ...Principles of Operation 4 51 Figure 4 2 A1 Block Diagram...
Страница 54: ......
Страница 57: ...Replaceable Parts 5 57 Figure 5 1 Mechanical Parts ldentification...
Страница 67: ...Figure 6 1 A1 Board Component Locations...
Страница 68: ...Figure 6 2 A4 Board Component Locations...
Страница 69: ...Figure 6 3 A1 Board schematic sheet 1...
Страница 70: ...Figure 6 3 A1 Board schematic sheet 2...
Страница 71: ...Figure 6 3 A1 Board schematic sheet 3...
Страница 72: ......