P1512161 R0
37
Figure 27.
Installing the Handle
Install the Cable and Clamps
1. Point the hopper handle toward the hopper (see
).
2. Secure the cable (1) to the handle with a cable clamp (2).
3. Route the cable through the cable rung (3) and around the cable sheaves.
4. Attach a 7/8" cable clamp (4) to the front upper frame using one 5/16" x 1" bolt (5), one 5/16" nut (6) and
two 5/16" flat washers (7). See
5. Loop the cable (1) around the 5/16" x 1" bolt (5) and secure with 1/4" cable clamp (2).
6. Test the function of the collapsible hopper cloth controls by raising and lowering the handle. Adjust cable
tension as required.
Table 10.
Cable and Clamp Components
Item
Description
1
1/8" Cable 13' [4.0 m]
2
1/4" Cable Clamp
3
Cable Rung
4
7/8" Cable Clamp
5
5/16" x 1" Bolt Gr8 Plated
6
5/16" Nylon Locknut Gr8
7
5/16" Flat Washer Plated USS
3
1
4
2
SWING AWAY CONVEYOR – PORTABLE GRAIN BELT CONVEYOR