
and hex nuts (G). Field drill the remaining three holes (L) using the wind ring coupling collar (K) as a
guide or template.
8. Install the remaining flange bolts (F) and hex nuts (G), and tighten all hardware to the recommended
torque specifications. See
Bolt Torque Specifications, page 22
.
Figure 9-23
Exploded view of wind ring installed at upper portion of stiffener
A
Flange bolt with sealing washer (part
number will vary)
G
7/16 in. hex nut (S-9281)
B
Wind ring bracket (CTS-1005)
H
3/8 x 1 in. flange bolt (S-7485)
C
Stiffener (part number will vary)
I
C-clamp (SS-7248)
D
Flange nut (part number will vary)
J
3/8 in flange nut (S-9426)
E
Wind ring section (CTS-1004-XX or CTS-
1002–XX)
9
K
Wind ring coupling collar (CTS-1006)
F
7/16 x 3-1/4 in. flange bolt with sealing
washer (S-10261)
L
Field drilled hole location
Figure 9-24
Dimensions for OSHA Compliant Ladder Rung Placement
NOTE:
Ensure the wind rings are installed in rela-
tion to the ladder rungs as shown to meet
O.S.H.A. specifications.
Pneg-4460A
60 Ft Diameter 40-Series Bins
161
9.
(-XX) denotes the bin diameter.
Содержание GSI 40 Series
Страница 6: ...NOTES 6 Pneg 4460A 60 Ft Diameter 40 Series Bins...
Страница 14: ...NOTES 14 Pneg 4460A 60 Ft Diameter 40 Series Bins...
Страница 28: ...NOTES 28 Pneg 4460A 60 Ft Diameter 40 Series Bins...
Страница 130: ...NOTES 130 Pneg 4460A 60 Ft Diameter 40 Series Bins...