Assembly Instructions
Step 11:
1 to 7 Springs
Instructions
Insert the Closed end of one spring Part F, onto one of the webbings yellow stitched V-Rings as
shown.
IMPORTANT
:
Correct Spring direction must be utilized to ensure a secure attachment as shown
in step 10.
Insert the Open end of the spring into corresponding spring slot (location 1) in the top of the
frame. See step 11
Using spring pulling tool (part G) to place 1 spring between each yellow stitched V-ring connector
to the middle of every other top rail section, following the sequence indicted above.
Hook the spring tool onto the end of the spring and pull until the spring can be inserted into the
spring slot on the top of the frame.
IMPORTANT
:
Springs must be inserted in the correct direction. The closed end will secure to the
mat and open end to the frame. Ensure all of the springs are fully inserted into the slots on top of
the frame.
Page 19 of 30
1
2
3
4
5
6
7
Yellow stitching
webbing
Содержание 166826
Страница 3: ...WARNINGS Page 3 of 30 ...
Страница 4: ...WARNINGS Page 4 of 30 ...
Страница 5: ...Page 5 of 30 ...
Страница 6: ...Page 6 of 30 ATTACH TO ENCLOSURE MESH AT DOOR Page 6 of 30 ...
Страница 7: ...Page 7 of 30 ...
Страница 8: ...Page 8 of 30 ...
Страница 9: ...Page 9 of 30 ...
Страница 10: ...Page 10 of 30 ...
Страница 30: ...Page 30 of 30 ...