background image

DirectCommand

 Installation 

Apache AS715/1010/1210 (MY 2009-2010)

 

Ag Leader Technology 

 

 

PN: 2005943 Rev. D 

December 2013 

Page 11 of 13

 

NOTE: When routing cable, avoid pinch points and leave 
enough slack so that cable will not be damaged when the 
boom is raised and lowered during operation. 

  

 

Enclosure for mounting Liquid Control Module

 

 
5.  Mount the Liquid Control Module PN: 4000394, in the Boom 

Enclosure with the hardware provided in the Hardware Kit PN: 
2001354-1.  

  
6.  Insert the Black Plug on the Implement Plug, PN: 4000495-1 into 

the receptacle labeled 

AUXILIARY

 on the Liquid Control Module. 

 

7.  Connect the 2-pin plug on the Hi-Current Power/CAN Bus 

Extension Cable into the 2-pin receptacle coming from the Liquid 
Control Module. 

 

8.  Connect the single end of the CAN Y-Splice from the 

DirectCommand Kit into the mating connector on the Hi-Current 
Power/CAN Bus Extension Cable.  

 

9.  Plug the black 4 pin connector of the CAN Bus Stub – 8 in. into 

the gray side of the Y-Splice.  

 

10. Connect the opposite end of the CAN Bus cable into the 

receptacle labeled 

CAN BUS

 on the Liquid Control Module. 

 

11. Plug the CAN Bus Terminator, PN: 4000141 into the black side of 

the Y-Splice installed in Step 8.  

 
 

Содержание DirectCommand

Страница 1: ...Y Splice 4000137 1 CAN Bus Terminator 4000141 1 Liquid Product Control Module 4000394 1 CAN Bus Stub 8 in 4000450 1 1 Flow Control Cable 4000451 6 1 Implement Stub 4000495 1 1 Apache Switchbox Adapte...

Страница 2: ...and operation of this product CAUTION will alert you to situations that will impact the physical safety of you or others IMPORTANT will alert you to the potential for damage to the product or loss of...

Страница 3: ...n contains illustrations of components common to all DirectCommand installations Their purpose is to ensure proper identification and installation in the sections that follow CAN Bus connectors 1 Term...

Страница 4: ...Ag Leader Technology DirectCommand Installation Apache AS715 1010 1210 MY 2009 2010 Page 4 of 13 December 2013 PN 2005943 Rev D Component and Cable Layout...

Страница 5: ...panels for any hoses wiring controls etc that could be damaged when drilling any mounting holes IMPORTANT Disconnect the Display DirectCommand components and flow meter from electrical system when wel...

Страница 6: ...Display NOTE The Raven boom section widths are in inches the Ag Leader Display requires boom widths in feet Divide the Raven widths by 12 before entering the widths into the Ag Leader Display 2 Run t...

Страница 7: ...1 Deutsch Dust Plug 6 pin PN 2002899 6 1 CAN Y Splice PN 4000137 1 CAN Bus Stub 1 ft PN 4000219 1 1 Auxiliary input Module PN 4000437 From Display Kit or Display Cable Kit 4100814 1 Power Control Rel...

Страница 8: ...Cable 6 Connect the Round 4 pin plug of the CAN Bus Stub 1 ft PN 4000219 1 into the gray side of the CAN Y Splice 7 Connect the opposite end of the CAN Bus Stub into the mating receptacle on the Auxil...

Страница 9: ...ADAR on the Auxiliary Input Module NOTE If a backup radar or wheel speed sensor has been installed on the machine contact your Ag Leader Dealer for the appropriate cabling to connect the Radar to the...

Страница 10: ...4001808 24 Step by Step for Installing the External Cabling and Liquid Control Module 1 Connect the 2 pin Deustch Receptacle on the Hi Current Power CAN Bus Extension Cable PN 4001808 24 to the matin...

Страница 11: ...Implement Plug PN 4000495 1 into the receptacle labeled AUXILIARY on the Liquid Control Module 7 Connect the 2 pin plug on the Hi Current Power CAN Bus Extension Cable into the 2 pin receptacle comin...

Страница 12: ...oom Cable into the appropriate Boom Valve NOTE Leave dust caps installed on all unused connectors in the 10 Section Boom Cable 15 Connect the gray 8 pin plug on the Flow Control Cable PN 4000451 6 int...

Страница 13: ...Threshold setting Decreasing this value will cause the servo valve to run slower Allowable Error 2 Determines the percent error that is allowed prior to the product control system making any flow rate...

Отзывы: