
Mounting and commissioning
LAG-14 ER
25
1. Open the control unit.
2. Mount the control unit to the wall.
A
Drill the fixing holes in the bottom
part with a Ø 5 mm drill.
Mount the bottom part to the wall
with the screws shipped with the
unit.
B 1
Mount the screw to the wall.
2
Fit the bottom part.
3
Fixate the bottom part by screwing the
bottom lug to the wall.