
Mounting and commissioning
10
KAV
1.
Select the appropriate compression rings and stiffeners.
2.
Lubricate the threads of the compression screws and the com-
pression rings with oil immediately prior to installation..
3.
Place the compression rings into the G sockets of KAV.
4.
Screw in the compression screws and slightly tighten them by
hand.
5.
Cut the pipes of the suction line to length perpendicularly and
debur them. Use the enclosed stiffeners in the case of soft or
semi-hard copper pipes. Push the pipes through the compres-
sion screw and the compression ring into the G sockets, all the
way to the stop.
6.
Tighten the compression screws with a 17/21 open end span-
ner.
Nozzle ca-
pacity
Inner
pipe Ø
Suction height H [m]
1.5
2.0
2.5
3.0
3.5
4.0
< 2.5 kg/h
(3 l/h)
Ø 4 mm
32
26
19
13
7
1
Max
im
um po
ss
ible s
uc
tio
n
li
ne
length [
m]
5 kg/h
(6 l/h)
Ø 4 mm
10
8
6
4
2
1
7.5 kg/h
(9 l/h)
Ø 4 mm
10
8
6
4
2
0
Ø 6 mm
54
43
33
22
12
1
10 kg/h
(12 l/h)
Ø 4 mm
8
6
4
3
1
0
Ø 6 mm
40
32
25
17
9
1
15 kg/h
(18 l/h)
Ø 6 mm
27
21
16
11
6
0
20 kg/h
(24 l/h)
Ø 6 mm
20
16
12
8
4
0
Ø 8 mm
64
52
39
26
14
1
Содержание KAV
Страница 17: ...Wartung 16 KAV 4 Absperrventil schließen 5 Die Verschraubung der Filtertasse öffnen ...
Страница 22: ...Anhang KAV 21 13 2 Zulassungsunterlagen ...
Страница 23: ...Anhang 22 KAV ...
Страница 24: ...Anhang KAV 23 ...
Страница 25: ...Anhang 24 KAV ...
Страница 41: ...Maintenance 16 KAV 4 Close the shut off valve 5 Open the screw connection of the filter cup ...
Страница 46: ...Appendix KAV 21 13 2 Approval documents ...
Страница 47: ...Appendix 22 KAV ...
Страница 48: ...Appendix KAV 23 ...
Страница 49: ...Appendix 24 KAV ...
Страница 68: ...Maintenance KAV 19 4 Fermez la vanne d arrêt 5 Ouvrez le raccord à vis du bol de filtre ...
Страница 73: ...Annexe 24 KAV 13 2 Agréments ...
Страница 74: ...Annexe KAV 25 ...
Страница 75: ...Annexe 26 KAV ...
Страница 76: ...Annexe KAV 27 ...