
Mounting and commissioning
KAV
9
5
Mounting and commissioning
Mount KAV in such a way that it is protected against damage, easily
accessible and can be operated easily.
The fuel oil consumer must generate a vacuum of at least 0.4 bar.
5.1
Installing KAV
1
Suction line from
tank
2
Suction line to
fuel oil consumer
3
Direction of flow
Fig. 3: Mounting
Any mounting position is permissible. The height difference between
the maximum tank level and the lowest point of the oil-carrying pipe
(safe height) must not exceed a maximum of 4.0 m.
KAV is also suitable for installation in the manhole of underground
tanks or in the inspection duct of the suction line if, for example,
parts of the suction line are underground and below the maximum
tank level.
Install KAV in the immediate vicinity of the tank in the suction
line above the maximum level in the tank (no mechanical forces
or mechanical tension may act on the unit).
Connecting the suction line
The scope of delivery includes three universal compression fittings
for pipes with outside diameters of 6/8/10 mm.
1
KAV
2
Compression
ring
3
Compression
screw
4
Stiffener
(Ø 8/10 mm
only)
5
Suction line
Fig. 4: Connecting the suction line
Содержание KAV
Страница 17: ...Wartung 16 KAV 4 Absperrventil schließen 5 Die Verschraubung der Filtertasse öffnen ...
Страница 22: ...Anhang KAV 21 13 2 Zulassungsunterlagen ...
Страница 23: ...Anhang 22 KAV ...
Страница 24: ...Anhang KAV 23 ...
Страница 25: ...Anhang 24 KAV ...
Страница 41: ...Maintenance 16 KAV 4 Close the shut off valve 5 Open the screw connection of the filter cup ...
Страница 46: ...Appendix KAV 21 13 2 Approval documents ...
Страница 47: ...Appendix 22 KAV ...
Страница 48: ...Appendix KAV 23 ...
Страница 49: ...Appendix 24 KAV ...
Страница 68: ...Maintenance KAV 19 4 Fermez la vanne d arrêt 5 Ouvrez le raccord à vis du bol de filtre ...
Страница 73: ...Annexe 24 KAV 13 2 Agréments ...
Страница 74: ...Annexe KAV 25 ...
Страница 75: ...Annexe 26 KAV ...
Страница 76: ...Annexe KAV 27 ...