![AFM GS 100 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/afm/gs-100/gs-100_user-manual_2864694029.webp)
Operation 29
With Ceramic Caps removed, unscrew outer nut from end of Tube using an open-end
wrench. If needed, hold inner nut with another open-end wrench. Check for dead short
across ends with a DVM. If open, replace tube.
To re-assemble, follow previous steps in reverse order.
2235
Outer Nut (2)
Inner Nut (2)
Содержание GS 100
Страница 1: ...GS 75 100 Radial Heat Shrink Tunnel User Guide ...
Страница 2: ......
Страница 4: ......
Страница 20: ...20 Operation Turn on FAN Switch Turn on HEATER Switch 2224 Fan Switch Heater Switch ...
Страница 22: ...22 Operation Shutdown Turn off HEATER Switch Wait fifteen 15 minutes Turn off FAN switch Turn off Power switch ...
Страница 25: ...Operation 25 Lift unit and remove Metal Cage covering the assembly Set aside 2231 Cage ...
Страница 34: ...34 Schematics Schematics Wiring Diagram GS Wiring 2225 ...
Страница 35: ...Schematics 35 Exploded Diagram 2226 ...
Страница 36: ...36 Schematics Exploded Diagram Fan 2239 ...
Страница 37: ...Schematics 37 Inside of Power Box 2228 ...
Страница 45: ......
Страница 46: ......