Operation 19
Operation
Power Up
When all the components have been properly mounted and connected, the GS tunnel is
ready to power up and begin production.
Tip!
Before powering up, double-check your installation. Make
a quick inspection to ensure all the components have been
securely mounted and all data and power cables are
properly seated and connected.
To power up the GS Tunnel, plug into power outlet. Push the power switch located on the
front of the controller to the ON (I) position.
Power Switch
2219
Airflow Control
Содержание GS 100
Страница 1: ...GS 75 100 Radial Heat Shrink Tunnel User Guide ...
Страница 2: ......
Страница 4: ......
Страница 20: ...20 Operation Turn on FAN Switch Turn on HEATER Switch 2224 Fan Switch Heater Switch ...
Страница 22: ...22 Operation Shutdown Turn off HEATER Switch Wait fifteen 15 minutes Turn off FAN switch Turn off Power switch ...
Страница 25: ...Operation 25 Lift unit and remove Metal Cage covering the assembly Set aside 2231 Cage ...
Страница 34: ...34 Schematics Schematics Wiring Diagram GS Wiring 2225 ...
Страница 35: ...Schematics 35 Exploded Diagram 2226 ...
Страница 36: ...36 Schematics Exploded Diagram Fan 2239 ...
Страница 37: ...Schematics 37 Inside of Power Box 2228 ...
Страница 45: ......
Страница 46: ......