18 Operation
Control Cabinet Overview
Important!
The control cabinet is not a watertight enclosure- do not
splash the cabinet with liquid.
The front face of the Control Cabinet has the following:
1. Power
2. “HEATER” switch
3. “FAN” switch
4. Left-and-Right Temperature Controls.
2224
Temperature
Controls
Heat
Power
Fan
Содержание GS 100
Страница 1: ...GS 75 100 Radial Heat Shrink Tunnel User Guide ...
Страница 2: ......
Страница 4: ......
Страница 20: ...20 Operation Turn on FAN Switch Turn on HEATER Switch 2224 Fan Switch Heater Switch ...
Страница 22: ...22 Operation Shutdown Turn off HEATER Switch Wait fifteen 15 minutes Turn off FAN switch Turn off Power switch ...
Страница 25: ...Operation 25 Lift unit and remove Metal Cage covering the assembly Set aside 2231 Cage ...
Страница 34: ...34 Schematics Schematics Wiring Diagram GS Wiring 2225 ...
Страница 35: ...Schematics 35 Exploded Diagram 2226 ...
Страница 36: ...36 Schematics Exploded Diagram Fan 2239 ...
Страница 37: ...Schematics 37 Inside of Power Box 2228 ...
Страница 45: ......
Страница 46: ......