25 PS 25-32-OI-vers.3.5 gb. 21.07.14.docx
3.2.4 Preparation for start-up
Before commissioning the shock absorber with stopper and the initiator holder must be
set in such a way that the stroke provided is attenuated correctly.
Commissioning
Ventilate the total system slowly.
Note the permissible values (see catalogue) regarding:
-
useful load
-
motion frequency
-
moment loads on the guide system
-
CAUTION
Limbs may be squeezed by moving components.
Make sure that there are no persons or tools within the operative range of the
module.
Carry out a test run
-
first of all with slow travel movements,
-
afterwards under operating conditions.
Maintenance and Upkeep
Under the following conditions the
PS 25 / 32 is maintenance-free:
clean workshop atmosphere
no splash water
no dust and fumes caused by abrasion or processes
ambient conditions according to the technical catalogue
Содержание 50076883
Страница 10: ...10 PS 25 32 OI vers 3 5 gb 21 07 14 docx 2 1 4 Slide unit load factors PS 25 ...
Страница 11: ...11 PS 25 32 OI vers 3 5 gb 21 07 14 docx 2 1 5 Preferred combinations PS 25 ...
Страница 12: ...12 PS 25 32 OI vers 3 5 gb 21 07 14 docx 2 1 6 Slide unit load factors PS 32 ...
Страница 13: ...13 PS 25 32 OI vers 3 5 gb 21 07 14 docx 2 1 7 Preferred combinations PS 32 ...
Страница 19: ...19 PS 25 32 OI vers 3 5 gb 21 07 14 docx 3 1 8 Dimensions drawing PS 25 ...
Страница 20: ...20 PS 25 32 OI vers 3 5 gb 21 07 14 docx 3 1 9 Technical data of the PS 25 ...
Страница 21: ...21 PS 25 32 OI vers 3 5 gb 21 07 14 docx 3 2 0 Dimensions drawing PS 32 ...
Страница 22: ...22 PS 25 32 OI vers 3 5 gb 21 07 14 docx 3 2 1 Technical data of the PS 32 ...
Страница 23: ...23 PS 25 32 OI vers 3 5 gb 21 07 14 docx 3 2 2 Technical data of the PS 32 ...
Страница 43: ...43 PS 25 32 OI vers 3 5 gb 21 07 14 docx ...