![AeroWorks YAK 54 ARF-QB Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/aeroworks/yak-54-arf-qb/yak-54-arf-qb_assembly-manual_2863274058.webp)
58
26. Final Greves pipe installation with hot air exits
slots cut out.
27. Front view of final pipe installation shown be-
low.
Canister Muffler Installation
1. Gather the header and canister parts as shown:
1 - 70mm drop flex header (left)
1 - 70mm drop flex header (right)
2 - MTW-TD 110 Long canisters (Rear exit)
2 - Teflon couplers
4 - clamps
2. Gather the included pre cut balsa canister tunnel
sheeting, and silicone tubing as shown below
4 x Pre cut balsa tunnel sheeting
8 x Pre cut silicon tubing