![AeroWorks YAK 54 ARF-QB Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/aeroworks/yak-54-arf-qb/yak-54-arf-qb_assembly-manual_2863274052.webp)
52
2. Gather the included pre cut balsa pipe tunnel
sheeting, lite-ply pipe mounting brackets, pre cut
silicone tubing and mounting hardware as shown
below.
2 x Pre cut balsa tunnel sheeting
2 x lite-ply pipe mounting brackets
16 x Pre cut silicon tubing
8 x 4-40 mounting bolts
8 x Flat washers
8 x Lock washers
3. Use a sealing iron to ensure the covering is
bonded to the bottom of the fuse frame around
the pre cut air exit holes.
4. Use a hobby knife to remove the covering from
the pipe tunnel pre cut air exit holes.
Note:
There are pre cut holes for both canister and
long Greves pipe installations. Take care to
only cut out the required hot air exit slots.
5. Covering removed from the eight hot air exit
holes for the long Greves pipe installation at
bottom of fuse.
Note:
If using standard mufflers, skip the
following steps and go to ignition
installation. Page #64