73
3.
Measure and mark a line 3/16” from the edge
of the template. This will allow for the over-
hang of the cowling to the front former.
4.
Template after marking.
5.
Mark a line 3/16” behind the front former on
each side of the pipe tunnel.
6.
Align the center of the template with the cen-
ter of the fuse and set back 3/16” behind the
front former.