MT-30
Installation, Operation & Maintenance
06225-03H.doc
16 of 47
AeroVironment, Inc
Inspect the equipment immediately upon receipt. If it has been damaged during shipment, keep
the shipping cartons and packing materials and file a claim with your freight carrier and/or
insurance company for shipping damage. If you discover shipping damage
after
acceptance, file
a claim for concealed damage.
4.0 Operation
4.1 Planning
Before you begin a test with the MT-30, you will need to decide on certain parameters.
The following checklist may be used as a guideline for preparation:
What load configuration is required?
Independent
Parallel
What should the operating limits be?