LaserTurn
®
1 Hardware Manual
Maintenance
Figure 4-7:
Wet Cut Rotary Union Shaft Inspection
Step 6: Lubricate the new seal with a generous amount of Parker O-Lube and press it uniformly into its
housing in the end cap.
Step 7: Apply Parker O-Lube to the exposed end of the rotary union shaft as shown in
.
Step 8: Pilot the end cap back onto housing sub-assembly by using the rotary union shaft and housing. Use
care when aligning the end cap so that damage does not occur to the newly installed seal.
Step 9: Tighten the end cap screws and reconnect water supply.
Step 10: Leak test stage prior to restoring stage power.
www.aerotech.com
Chapter 4
47
Содержание LaserTurn 1 Series
Страница 1: ...Revision 1 07 00 LaserTurn 1 Hardware Manual ...
Страница 8: ...Table of Contents LaserTurn 1 Hardware Manual 8 www aerotech com This page intentionally left blank ...
Страница 12: ...Overview LaserTurn 1 Hardware Manual 12 Chapter 1 www aerotech com This page intentionally left blank ...
Страница 52: ...Maintenance LaserTurn 1 Hardware Manual 52 Chapter 4 www aerotech com This page intentionally left blank ...
Страница 56: ...Revision History LaserTurn 1 Hardware Manual 56 Appendix B www aerotech com This page intentionally left blank ...