Section 2. SET UP PROCEDURE
This manual describes methods, which are distinctive to the
Stealth KPL 2
. Procedures, typical for
all gliders are described in less detail.
The set up procedure should be carried out on a clean, non abrasive surface.
ATTENTION:
After each set up procedure you must do a preflight inspection of the glider.
2.1. Set up procedure from the 4 meters long package
2.1.1. With the glider in the bag (4 metres long) lay the glider on the ground.
2.1.2. Unzip the zipper. Undo the velcro straps. Remove the batten bags, the speedbar, the aft
leading edge tubes (N3) and wing tips from the bag.
2.1.3. Unfold the sail along the leading edge. Attach the aft leading edge tubes (N3) to the forward
leading edge tubes (N2) according to the marking (L-left, R-right, marks must be on the top).
2.1.4. While installing the leading edge tubes into the sail, place the washout tips facing forward
toward the nose of the wing and along the leading edge tubes (Fig.1). Note: put washout tips
outside the sail, through zipper holes. Tighten the sail along the leading edge and put the sail mount
webbing into the slot in the end cap.
Fig. 1
2.1.5. Install the dive sticks to the corresponding places on the LE-tube/X-beem junctions. Attach
the dive sticks using pins and safety rings (Fig. 2). The dive sticks must be outside of the bottom
surface.
Содержание Stealth 13 KPL 2
Страница 4: ...3 Test pilot______________________________ __________________________...
Страница 22: ...21 TABLE OF CHANGE AND ADDITION DATE WORK DONE BY WHOM...
Страница 26: ...25 THE FRAME...
Страница 27: ...26 NOSE JUNCTION...
Страница 28: ...27 HANG POINT SYSTEM...
Страница 29: ...28 REAR KEEL LINE...
Страница 30: ...29 CROSS BEAM JUNCTION...
Страница 31: ...30 STRUT SYSTEM...
Страница 32: ...31 COMPLETE RIGHT UPRIGHT...
Страница 33: ...32 COMPLETE LEFT UPRIGHT...
Страница 34: ...33 VG ROPE SYSTEM...