6
2.2.2. Set the glider on the control bar, spread the leading edges so that sail is a little sagged and the
glider is resting on the wing tips and on the keel tube (Fig. 4). The keel battens must be rested on
the keel tube.
Fig. 4
2.2.3. Install the small mast on the LE-tubes/X-beam junction to it’s proper place. Dive sitcks must
be outside of sail. (Fig. 5).
Remove the battens from the bags and insert battens No.2 - 6 into corresponding batten pockets
(don’t remove the bags from the wing tips). (Fig. 6). Secure each top batten by the batten cord.
Fig. 5
Содержание Stealth 13 KPL 2
Страница 4: ...3 Test pilot______________________________ __________________________...
Страница 22: ...21 TABLE OF CHANGE AND ADDITION DATE WORK DONE BY WHOM...
Страница 26: ...25 THE FRAME...
Страница 27: ...26 NOSE JUNCTION...
Страница 28: ...27 HANG POINT SYSTEM...
Страница 29: ...28 REAR KEEL LINE...
Страница 30: ...29 CROSS BEAM JUNCTION...
Страница 31: ...30 STRUT SYSTEM...
Страница 32: ...31 COMPLETE RIGHT UPRIGHT...
Страница 33: ...32 COMPLETE LEFT UPRIGHT...
Страница 34: ...33 VG ROPE SYSTEM...