background image

COMBAT REASSEMBLY AFTER SHIPPING PROCEDURE 

 

1. With the glider in the bag (4 meters long) lay the glider on the ground. 
 
2. Unzip the bag. Undo the velcro straps. Remove the batten bag, the speedbar, the rear leading edge tubes # 3 and 

winglets from the bag. 

 
3. Unfold the sail along the leading edge to its full length. Attach the rear leading edge tubes # 3 to the front leading 

edge tubes # 2 according to the marking (L-left, R-right, marks must be on top). 

 
 

  5

Working on one wing at a time, and working with the 

appropriate leading edge # 3, fold the outer sprog, which 
is attached to the rear leading edge, forward against the 
rear leading edge. Slide the inboard end of the leading 
edge tube # 3 into the sail.  

 
Then slide the rear leading edge forward, allowing 

the sprog end to come outside the sail at the access 
zipper, and slide the rear leading edge into the front 
leading edge.  

 
Align the rear leading edge properly so that the sprog 

bracket is on the inside of the leading edge, and slide 
the rear leading edge forward, rotating as necessary, 
until the button spring in the rear leading edge engages 
securely into the holes in the front leading edge. When 
the rear leading edge is fully engaged, you will not be 
able to rotate it 

(Fig.1). 

 

                                                                                                                

 

Fig. 1

 
4. Tighten the sail along the leading edge by putting the sail mount webbing into the slot in the end cap of the leading 

edge # 3. 
 

Note: 

the sail mount screws on the front part of the leading edge tubes # 1 must be unscrewed, otherwise the 

excess sail tension will not allow tightening the sail.  
The sail mount screws have to be screwed back after you accomplish all steps in section “Combat set-up 
procedure” from item 1 through item 8. 

 

5. Secure the sail mount webbing to the leading edge # 3 with the sail mount webbing velcro. 

 

Note: 

When spreading

 

the wings with the sail mount screws been unscrewed check that the sail mount webbing 

is in proper position in the slot of the end cap of the leading edge # 3.  

 
 
 

Fig. 2

 
 

6. Install the tip bags.  
 
Put battens on top of the glider between Mylar 

pockets in the front part of the glider.  

 
Place velcro ties around the glider.  
 
Put the speedbar and winglets between leading 

edges in the rear part of the glider.  

 
Put the glider bag back on and zip it up 

(Fig.2).

 

Содержание COMBAT-09

Страница 1: ...______________ Date of production ___________________ Serial number ___________________ Manufactured by AEROS Ltd Post Volynskaya St 5 Kiev 03061 UKRAINE Tel 380 44 455 41 18 Fax 380 44 455 41 16 E ma...

Страница 2: ...1...

Страница 3: ...6 Preflight procedure 11 Laying the glider down flat 12 Launching and flying the Combat 13 Aerotowing 13 Using the VG system 14 Landing the Combat 14 Safety in turbulance 15 Combat breakdown 15 Remov...

Страница 4: ...safety and comfort Please read and be sure you thoroughly understand this manual before flying your Combat Be sure you are thoroughly familiar with the set up break down preflight and maintenance proc...

Страница 5: ...ot clip weight km h mph 29 31 18 19 29 31 18 19 29 31 18 19 29 31 18 19 29 31 18 19 Max airspeed with optimal pilot clip weight km h mph 110 69 110 69 110 69 110 69 110 69 Min clip pilot weight kg lb...

Страница 6: ...rotating as necessary until the button spring in the rear leading edge engages securely into the holes in the front leading edge When the rear leading edge is fully engaged you will not be able to rot...

Страница 7: ...d the rear of the leading edge tubes 2 to prevent sail damage during transportation 5 Carefully fold the rear of the sail over against the front place velcro ties around the glider and put on the glid...

Страница 8: ...ot be any deviation of more than 3mm 1 8 from one batten to the other along the full length of the battens Aeros convention is that green blue marked battens go in the right wing and red marked batten...

Страница 9: ...resistance in the pockets Fig 12 9 Spread the wings all the way and check all cables for any twisted thimbles or tangled cables At the rear of the keel find the shackle of the sweep wire Pull the sha...

Страница 10: ...n the batten completely 9 Fig 13 Fig 14 12 Install the bottom surface battens Fig 14 13 The next step is to deploy both the inboard sprogs and the outboard sprogs and secure them in position Before do...

Страница 11: ...that it lies flat on the top and bottom of the sail Fig 17 Fig 17 Don t fly without the nosecone 15 Attach plastic winglets Put front part of the winglet between the sail and the outer part of the lea...

Страница 12: ...form before plastic winglets have been installed Look into the sail from the wing tip Tip folded batten must be rested on the batten stop The washout tip must be installed Check for any evidence of de...

Страница 13: ...does not slide past the rear edge of the transverse battens or the system could malfunction Check the crossbar center plates assembly including the sweep wire X bar junction all bolts are in places s...

Страница 14: ...p to 110 km h 69 mph being essentially roll neutral with no tendency to yaw The pitch bar pressure decreases with the VG on being light when flying close to the trim speed but progressive and consiste...

Страница 15: ...VG set between full loose and 1 2 on A full loose VG setting will reduce glide performance making it easier to land on a target or within a small field It will also ensure maximum control authority d...

Страница 16: ...tely or to VG when expecting a strong turbulence While in turbulence make sure you keep a very firm grip on the speedbar and do not sacrifice this strong grip to release the VG It is best to wait for...

Страница 17: ...the Mylar or leading edge sail material Fig 25 11 Working from the trailing edge roll the sail tightly to the leading edge and install the tip cover bags 12 Secure the sail with the velcro sail ties...

Страница 18: ...Make sure the surface is clean If it is abrasive you should our sail er bag Untie the velcro ties remove the basebar winglets on bag m the sail Dismount the sail from the front leading edge by bing v...

Страница 19: ...13 Attach the rear wires to the rear of the keel 14 Set the glider up onto the control bar 15 Spread the wings slowly and carefully making sure that the sail rides forward as necessary at the nose wit...

Страница 20: ...ions and immediate maintenance of any items on the glider which require it Safety requires that your glider be fully airworthy for every flight Nuts and bolts must always be secure safeties must alway...

Страница 21: ...L 15 Co onsists of visual inspection mbat L 07 12 Combat L07 13 Combat L07 14 Combat L07 15 and c 1 General inspection T alls he crossbeam should be free of visible defects damage of the bearing struc...

Страница 22: ...nt is the location along the keel of your hang point The fa especially in turbulent air and when the nose pitches up on entering a strong thermal On the Combat hang loop fore and aft position is adjus...

Страница 23: ...e sprog To raise the sprog turn the end of the sprog threaded adjuster counter clockwise To lower the sprog turn it clockwise 3 Re install the pin to the sprog threaded adjuster zip the access zipper...

Страница 24: ...ected by e twisting the sail up at position using the first start to correct it as it Fig 31 cause a significant increase in trim s cause excessive pitch bar pressure at in any case should be performe...

Страница 25: ...crease batten tension rotate the threaded lever batten tip adjuster clockwise is not bent to one side Check that the crossbar neither cracks nor any visible damage Check the battens for symmetrical sh...

Страница 26: ...experience Remember that ultimately your safety is your responsibility Fly only in places that are suitable for hang gliding With proper care and maintenance your glider will retain a high level of a...

Страница 27: ...26...

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ...0 STL 154 000 Blind Rivet d4x10 A2 Washer M6 DIN 125 CBT07 13 637 000 STD 0033 C 15 0020 414 003 Washer M6 DIN 125 Nut M6 self locking DIN 985 Washer M8 DIN 125 DSC14A 114 000 STL 181 000 Nut M8 self...

Страница 36: ......

Страница 37: ...2 14 9 1 CBT09 110 001 AD Tube 2 Assembled Right show CBT09 110 002 AD Tube 2 Assembled Left mirror reflection Tapping Screw 2 2x6 5 Washer M3 DIN 125 A2 CBTL 13 114 000 CBTL 13 114 000 Safety Ring S...

Страница 38: ......

Страница 39: ...T07 142 000 AD CBT2 13 144 000 FT300 19 9 5 40 FT300 19 9 5 110 Safety Ring SBR1011 CBT2 13 204 000 Safety Ring SBR1011 CBT07 141 000 AEROS 10 02 10 0 255 Combat09 12 8 13 2 13 7 14 2 14 9 1 2 Sprog O...

Страница 40: ...9 12 8 13 2 13 7 14 2 14 9 1 2 5 Sprog Internal CBT07 160 000 AD 3 1 1 2 PBF D 25 4 125 Safety Ring SBR1011 CBT07 163 000 AD STL 244 003 PBF D 25 4 30 Safety Ring SBR1011 Pin 4 28 26 CBTL 13 164 000 S...

Страница 41: ...Keel Tube Assembled 10 02 10 1 AEROS 2 40 Combat09 12 8 13 2 13 7 14 2 14 9 CBT09 189 000 AD 3 1 5 1 1 CBT09 190 000 AD STL 101 005 CBT09 191 000 AD DSC14B 193 000 AD CBT09 13 189 003 WD...

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ......

Отзывы: