
MRK-D-0034 V2.0
Aeroqual AQM 65 User Guide
Page | 79
Make sure that you read the gauge correctly. The PSI scale is the inside blue scale (the outside scale
is bar) See Figure 4-35
Figure 4-35 The PSI scale in the inside of the dark blue circle
The process for pressurising the compressor is as follows:
Gently open the valve of your cylinder or can and watch the pressure gauge increase until just
over your desired set point.
Turn off the cylinder or can valve and wait 3 to 5 minutes and watch the gauge. The gauge
might slowly come down again as the gas pressure equilibrates in the cooling system.
If the needle drops below your target pressure then repeat again, each time only let in a small
amount of gas and WAIT for the gauge needle to stabilise. Stabilisation may take several
minutes (5 minutes).
If you overfill by mistake you can release pressure from the valve on the tee. Unscrew the connection
to the R12 valve.
1. Use a pen or similar to press in the valve pin. Do this for a short time 2 seconds only. Watch the
needle on the gauge. Wait (2 to 3 minutes) for the pressure to stabilise.
2. Repeat the process until the pressure reaches the target level.