
MRK-D-0034 V2.0
Aeroqual AQM 65 User Guide
Page | 28
You need to make sure you have correctly and securely inserted the aluminium tube fully in to
the optical engine block.
Push the fuse holder in to the “on” position. And connect the white power plug to the module
to begin flowing air through the inlet.
Then perform a leak check and flow check. See Section 4.4.5 and Section 4.4.6
Figure 2-9 Apply power to the PM module, then fit the vacuum gauge to the inlet to test for leaks.
When you are satisfied the inlet is fully pushed in to the engine block, then connect the heater
plug on the inlet to the plug coming from the module.
Insert the three 6/32 UNC retaining screws to secure the inlet to the aluminium retaining ring
Figure 2-10 During field installation, secure the PM inlet using the retaining screws and plug in the heater
2.2.3 Attach gas inlet
The gas inlet is held by a ¼ inch Swagelok compression fitting.
Attach the inlet and perform a flow check to make sure the inlet is fitted correctly and the
sample pump is working properly.
When the AQM 65 is sampling ambient air in the field, a Kynar inlet fitting with mesh is
attached to the Swagelok nut at the end of the sample cane.
NOTE:
Detailed instructions on gas flow measurement are given in Section 4.4.3.1