9
5. Install the canopy using the small wood screws.If satisfied with the fit,remove the canopy and hatch
and wick a small amount of thin CA into each of the screws holes on the hatch.Once dried, reinstall
canopy with optional canopy glue if desired.
Caution!
CA will fog the canopy if installed before
completely drying
(figure 30, 31, and 32).
6. Test fit and install the Canopy Hatch on the fuselage using the
3
four 4/40 x /
bolts with spring and flat washers provided.If
4
satisfied,remove and set aside hatch for cowling installation
(figure 33).
1
7. For the cowling,drill two holes in the bottom for the two 6/32 x /
2
bolts from inside the cowling
using the cowl ring holes as a guide.
(figure 29).
1
8. Install the comling using the four 6/32 x /
2
bolts ,spring washers, and flat washers. If satisfied with
the fit, remove the cowling and set aside for firewall and engine installation
(figure 30 and 31).