background image

 

 

RN200 Mono Software User Manual

 

 

20 

 

7

 

Safety and Warning 

7.1

 

Precautions of device usage 

1.

 

Please use the provided packing crate to transport the device; please exercise care when 
transporting the device to avoid damage. 

2.

 

Do not place the device in a vibrating environment as this may damage the product. 

3.

 

Use a 110V AC power supply for the device to prevent any damage to product hardware 
caused by high power pulse. 

4.

 

Ensure proper grounding for the power supply as poor or wrong grounding may cause 
damage to the product. 

5.

 

Please keep away the device away from the electromagnetic interference environment 
when using the product. 

6.

 

Do not place the product in an environment where it may be exposed to water or other 
liquids. 

7.

 

Do not use the product in extreme heat, cold, dusty, corrosive, or high humidity 
environments. 

8.

 

When operating the device, wear static wrist straps. 

9.

 

When the device is powered on and a fault occurs, turn off the power and inspect the 
device immediately. The working site should be protected for fault analysis in the event 
of a major fault. 

10.

 

When the product is not working properly, please contact the technical support service.  
Do not attempt to disassemble or repair the product in any way as you will void the 
warranty. We cannot assume any responsibility for issues and problems caused by 
unauthorized product modifications and/or repairs. 

 

7.2

 

Precautions of personal safety   

1.

 

Ensure proper grounding for the power supply; improper grounding may result in injury. 

2.

 

When cleaning  the device, please power off to prevent the electric shock. Wipe the 
exterior surface of the device with a dry and soft rag. Do not attempt to clean the interior 
of the device. 

Содержание RN200 mono

Страница 1: ...RN200 mmWave OTA Test System AeroGT Labs October 20 2022...

Страница 2: ...ch information updates File name RN200 mmWave OTA Test System User Manual Document number GTS PC SD 008 Document version A1 2022 9 23 Revision of records Edition Date Prepared by Reviewed by Approved...

Страница 3: ...tive Test RF Test 12 3 2 1 Active non signaling RF test with built in test module 12 3 2 2 Active Signaling RF test with test instrument 13 3 2 3 Active non signaling RF test with test instrument 13 4...

Страница 4: ...tests according to various technical requirements This system supports many functions arbitrary vector signal generation VSG arbitrary vector signal analysis VSA spectrum analysis S21 amplitude phase...

Страница 5: ...igned for vector signal generation and analysis is ideal for 5G non signaling FR1 FR2 testing Its multiple RF input output channels support the real parallel test which can improve test efficiency and...

Страница 6: ...o support and rotate the DUT and provide high precision motion control for testing the DUT 6 The RF link mainly includes some RF components such as mmWave feeds reflectors transmission cables amplifie...

Страница 7: ...s is flexible Different users or different applications can utilize particular test functions such as passive test active test and RF test etc Customers can select one or multiple test functions for t...

Страница 8: ...requency error LO leakage EVM etc Note Tx signal can be a user defined arbitrary wave Rx test Receiving power level receiving sensitivity DUT should support signal demodulation Note system receives ar...

Страница 9: ...Quiet Zone QZ 200 x 200 x 200mm 7 9 x 7 9 x 7 9 inch QZ Amplitude Variation 1dB QZ Phase Variation 5 Dimensions 700L 620W 950H 24 4 x 37 2 x 27 8 inch Max DUT Weight 5 kg Passive Test Accuracy 1 dB TR...

Страница 10: ...e Name Description Feeds With H and V polarization Reflector Converting spherical waves to plane waves and vice versa Positioner Turntable Movement along Phi axis Theta axis LAN port For external conn...

Страница 11: ...e User Manual 8 2 2 Coordinate Systems The RN200 coordinate systems are shown in Figure 4 Figure 4 Coordinate Systems 2 3 Interface Panel The RN200 interface panel is shown in Figure 5 Figure 5 Interf...

Страница 12: ...rnal instrument is in use Signal Indicator A red light indicates an error A blinking yellow light indicates that the system is booting up A green light indicates a normal status and the system is oper...

Страница 13: ...ect connection to the RN200 to the control PC via the LAN port with an RJ45 cable or connect to a network switch optional firstly then connect to the control PC indirectly 2 Use a USB cable and connec...

Страница 14: ...Type B port on the interface panel with a USB port on the control PC 3 Connect the DUT to the RF port on the positioner with an RF cable 4 Connect Port1 of the VNA to the PSV port on the interface pa...

Страница 15: ...the internal test module is shown in Figure 8 Figure 8 Active RF test system diagram with ODC200 Cables connection instructions 1 Directly connect the RN200 to the control PC via the LAN port with an...

Страница 16: ...nnect the device s USB Type B port on the interface panel with a USB port on the control PC 3 Connect the uplink downlink signal of the wireless tester instrument to the SPDT RF switch and connect the...

Страница 17: ...ork switch then connect the control PC to the network switch with an RJ45 cable 2 Use a USB cable and connect the device s USB Type B port on the interface panel with a USB port on the control PC Conn...

Страница 18: ...vers to open the wooden crate Take caution not to prevent damage to the product during unpacking Please refer to Figure 11 for precautions Picture 11 Device Warning Label The part list for the RN200 m...

Страница 19: ...RN200 Mono Software User Manual 16 Figure 12 RN200 mmWave OTA Chamber Figure 13 110V 10A Power Cord...

Страница 20: ...RN200 Mono Software User Manual 17 Figure 14 CAT6 LAN Cable Figure 15 USB Type A to Type B Data Cable...

Страница 21: ...e RN200 out of its packing box and place it on a flat and firm desktop 2 Connect the power cord to the RN200 then plug the other end of the power cord into a power outlet 3 Connect a LAN cable to the...

Страница 22: ...o Internal Instrument 2 Press the power button the button should turn green 3 The signal indicator will flashes yellow indicating the controlling and testing module is booting up After about 30 second...

Страница 23: ...the product in extreme heat cold dusty corrosive or high humidity environments 8 When operating the device wear static wrist straps 9 When the device is powered on and a fault occurs turn off the pow...

Страница 24: ...cleaned and maintained regularly Please power off the device before the cleaning and maintenance 1 Chamber cleaning Use a soft damp and clean rag Wipe off dust and dirt from the surface 2 Instrument r...

Страница 25: ...omputer and the RN200 are not configured in the same local area network 1 Observe whether the signal indicator is normal or not and check the network cable connection 2 Configure the PC and the RN200...

Страница 26: ...istake 4 Use another DUT and re run the test 9 3 Device Verification 1 Before starting to use the RN200 for a test please use a DUT golden unit that has stable performance to perform the OTA system ve...

Отзывы: