operating manual B100F / B140F 2019-06-27
5
1.4. During operation
Always keep in front of the turbine (intake facing), never
to the
side
or in the
exhaust area
of the turbine.
Also make sure that no other persons or animals are present
in the mentioned dangerous areas.
Keep your hands and every kind of object out of the area within
20 cm of the compressor (intake). The enormous suction can
grasp everything within reach lead as quickly as a flash and
lead to severe injury or damage.
Never look into the jet exhaust. Severe burns can be the result.
1.5. After shutting off the engine
Place model with the nose facing the wind. Wait until the
cooling down process is completed.
Be aware of the cooling process after engine shut down.
During this process, the electric power supply of the receiver
and the ECU must
not
be turned off. The cooling down process
takes 1 – 2 minutes, depending on outside air temperatures.
Do not touch the turbine during the cool-down because the
danger of burning still exists.
All tube connections must be inspected for leakage. The fuel
tanks must be emptied in case of extreme outside
temperatures or when there is no upcoming operation planned
(danger of explosion!).