background image

BARCODE

EN

Installati on and Maintenance Manual

CHILLERS 

•  EXTERNAL UNITS
•  HIGH EFFICIENCY

ANL

290-650

18.03. 5719210_03

Содержание Variable Multi Flow ANL 290

Страница 1: ...BARCODE EN Installation and Maintenance Manual CHILLERS EXTERNAL UNITS HIGH EFFICIENCY ANL 290 650 18 03 5719210_03...

Страница 2: ...es In addition the applied mark guarantees that our appliances fully comply with the safety requirements defined by the applicable product s rules We constantly monitor the quality level and as a resu...

Страница 3: ...EN 60335 2 40 A2 2009 CEI EN 55014 1 2017 CEI EN 60335 2 40 A13 2012 CEI EN 55014 2 2016 La presente dichiarazione di conformit rilasciata sotto la responsabilit esclusiva del fabbricante This declara...

Страница 4: ...7 3 Dimensions ANL 580 620 650 mm 15 7 4 Position of hydraulic connections mm 16 7 5 ANL C 290 300 340 400 mm 17 7 6 ANL C 580 620 650 mm 17 8 Electrical connections 18 8 1 Electrical power supply con...

Страница 5: ...h the equipment as this could result in accidents for which the manufacturer will not be held responsible The warranty will be voided if the above mentioned warnings are not respected 1 2 SAFETY INSTR...

Страница 6: ...ifting capability of the equipment being used taking into account the information provided with the packaging When lifting insert through the unit s base holes lifting bars NOT PROVIDED of sufficient...

Страница 7: ...nnection to the unit This clean ing eliminates welding slag dirt rust or any other impurities from the piping These impurities may otherwise be deposited within the unit and cause a malfunction The co...

Страница 8: ...freezing 1 Complete draining of water from the unit 2 Operating with glycol with a percentage of glycol se lected in accordance with the minimum anticipated external temperature 3 Use of electric hea...

Страница 9: ...ly sized for the required flow rate The water flow rate through the heat exchanger must always be constant WARNING Carefully clean the system prior to connection to the unit This clean ing eliminates...

Страница 10: ...must always be constant WARNING Carefully clean the system prior to connection to the unit This clean ing eliminates welding slag dirt rust or any other impurities from the piping These impurities ma...

Страница 11: ...heat exchanger must always be constant WARNING Carefully clean the system prior to connection to the unit This clean ing eliminates welding slag dirt rust or any other impurities from the piping Thes...

Страница 12: ...217 2 28 75 221 6 21 32 164 4 21 76 167 7 VT17 12 0 0 6 ANL 400 L P2 797 754 1049 536 52 805 1080 542 27 56 220 5 28 37 226 9 21 72 173 7 22 35 178 8 VT17 12 0 0 6 ANL 400 L P3 778 735 1032 537 54 788...

Страница 13: ...25 1160 1100 800 800 800 1100 3000 A Gy Gx B C D 1610 40 16 16 16 16 40 420 420 2050 200 200 2050 200 200 20 20 1060 7 1 DIMENSIONS ANL 290 300 340 mm 7 1 1 MAXIMUM OVERALL mm 1610 40 16 16 16 16 40 4...

Страница 14: ...0 16 16 16 16 40 420 420 2050 200 200 2050 200 200 20 20 1060 7 2 2 LIFTING POINTS mm 16 16 16 16 2050 200 200 2050 200 200 20 20 1060 7 2 3 POSITION ANTI VIBRATION MOUNTS mm 1605 1735 2450 2525 1160...

Страница 15: ...IMUM OVERALL mm 1875 3200 3275 2005 1100 1160 800 800 800 1100 3000 40 16 16 16 16 16 16 40 1525 1275 200 200 1525 1275 200 200 Gy Gx 1956 40 16 16 16 16 16 16 40 644 600 1525 1275 200 200 1525 1275 2...

Страница 16: ...UT 2 IN 2 195 180 670 ANL 290 300 340 400 VERSION 00 ANL 290 300 340 400 VERSION 01 02 03 04 P1 P2 P3 P4 IN 2 OUT 2 IN 2 OUT 2 205 180 492 205 180 670 IN 2 OUT 2 IN 2 OUT 2 IN 2 OUT 2 205 180 492 195...

Страница 17: ...ANL 290 650 EN 7 5 ANL C 290 300 340 400 mm 7 6 ANL C 580 620 650 mm 191 184 152 233 189 183 138 219 A C B D 189 183 138 219 C D A Inlet Intake line 35 B Otlet Liquid line 22 C Inlet Intake line 42 D...

Страница 18: ...e below 2 The unit is only powered up on completion of any hydraulic and electrical works 3 Comply with the indicated phasing and earth requirements 4 The power supply cable must have the appropri ate...

Страница 19: ...ct functioning of any flow switch installed close the isolating valve on the evaporator outlet and observe the result on the unit display panel open the valve and reset the flow trip alarm 9 3 FIRST S...

Страница 20: ...t the control panel is off WARNING For the installation refer to the electrical wiring schematics provide with the unit The electrical wiring schematic and manuals must be carefully conserved and made...

Страница 21: ...n and energy efficiency The fundamental required annual checks are 11 1 HYDRAULIC CIRCUIT CHECK 1 Water circuit is filled 2 Water filter is clean 3 Operation of the differential pressure or flow switc...

Страница 22: ...vents and of the terminal units 14 5 UNIT DRAINING WARNING During the winter period the water in the heat exchanger may freeze when the system is off causing irreversible damage to the heat exchanger...

Страница 23: ...installed PR3 Not installed Go to question 3 Installed Enter in parameter PAN index 9 menu INSTALLER with the appropriate value Value 1 Season selection controlled from the chiller circuit board ON OF...

Страница 24: ...ns loose Operating outside of limits Check against operating limits chart Pressostat faulty Replace the component Thermal cut out operates Check voltage and settings Check insulation of windings Compr...

Страница 25: ...02 04 P2 P4 9 Liquid sight glass 10 Desuperheater optional 11 Water filter 12 Pump s optional 13 Expansion tank standard with hydronic module 14 Buffer tank optional 15 Flow switch 16 Gauge 17 Air ven...

Страница 26: ...nal valve only for versions 02 04 P2 P4 9 Liquid sight glass 10 Desuperheater optional 11 Water filter 12 Pump s optional 13 Expansion tank standard with hydronic module 14 Buffer tank optional 15 Flo...

Страница 27: ......

Страница 28: ...C S p A Via Roma 996 37040 Bevilacqua VR Italia Tel 39 0442 633111 Fax 39 0442 93577 marketing aermec com www aermec com Aermec reserves the right to make all modification deemed necessary for improvi...

Отзывы: