AERMEC NRB 0282 Series Скачать руководство пользователя страница 50

50

must be carried out by competent and authorised personnel;

-   Perform brazing or welding only on empty pipes and clear of any 

lubricating oil residues; do not near flames or other heat sources to 
the pipes containing under pressure fluids;

-   Do not work with naked flames near the unit;
-   Do not bend or hit pipes containing under pressure fluids;
-  The unit is equipped with overpressure release devices (safety valve): 

if these devices intervene, the refrigerant gas is released at high 
temperature and speed;

-   The machine and the pipes have very hot or very cold surfaces that 

lead to risk of burns by contact;

-   Do not use your hands to control any refrigerant leaks;
-   Before removing elements along the under pressure hydronic circu-

its, shut-off the pipe section involved and gradually drain the fluid 
until its pressure and that of the atmosphere are balanced.

PREVENTION AGAINST RESIDUAL ELECTRICAL RISKS

-  Before opening the electrical panel, disconnect the unit from the 

mains by means of the external isolator;

-  Wait the time indicated on the machine plate from when the power 

supply was disconnected from the unit before accessing inside the 
electrical panel;

-  If the unit is equipped with integrated inverter type compressors, 

disconnect the power supply and wait at least 5 minutes before 
accessing for maintenance: the internal components remain live for 
this time, generating the risk of electrocution.

-  If the power supply cable is damaged, it must be replaced by the 

manufacturer, After Sales Service or by another similarly qualified 
person, to avoid dangerous situations.

CLEANING THE MACHINE

The machine must be turned off and electrically disconnected when 
being cleaned.

INSPECTION AND CONTROL

The machine must be turned off and electrically disconnected during its 
inspection and leak check.

ROUTINE AND EXTRAORDINARY MAINTENANCE

The machine must be turned off and electrically disconnected during its 
maintenance (with possible replacement of components). In particular:
-  Before any intervention, isolate the unit from the mains by means of 

the external isolator provided for the insertion of padlocks (up to 3) 
for blocking in ‘’open’’ position;

-  Place a sign reading ‘’Do not turn on – maintenance in progress’’ on 

the open isolator;

-  Equip yourself with tools in good condition and make sure to have 

fully understood the instructions before using them;

-  Equip yourself with the appropriate personal protective equipment 

as indicated in paragraph 1 of this report;

-  For outdoor units, do not perform interventions in dangerous wea-

ther conditions such as rain, snow, fog, thunderstorms, etc;

-  The cooling circuit components must be replaced after draining the 

refrigerant gas contained in the circuit;

-  During venting protect yourself against any leakage of fluids at dan-

gerous temperatures and/or pressures;

-  Always use appropriate equipment (extractor, antistatic bracelet etc) 

when replacing electronic boards;

-  If replacing a motor, compressor, evaporator, condensing coil or any 

other heavy element, make sure that the lifting devices are compati-
ble with the weight to be handled;

-  In air units with independent compressor compartment, do not 

access the fan compartment without having first disconnected the 
machine through the isolator on the board and having placed a sign 
reading ‘’Do not turn on – maintenance in progress’’;

-  Always and only use original spare parts purchased directly from Aer-

mec or from official dealers. Contact Aermec should it be necessary 
to move the unit one year after its positioning on-site or it must be 
dismantled;

-  It is not permitted to change the refrigerant, hydraulic or electric 

layout of the unit, or its control logic unless expressly authorised by 
Aermec;

-  The machine must be loaded with the refrigerant in the feature label 

and in the required quantity;

-  Make sure to have removed all tools, electrical cables or other loose 

object and having perfectly connected the machine to the system 
before closing it and starting it;

-  The inspections and measurements necessary to establish the correct 

functioning of the machine to be run with the machine in operation, 
must be performed with the machine closed (framework fixed on 
the machine), reading the measurements collected by the control 
board and viewable in the control panel of the same. In the case of 
machines with cooling circuit compartment open, stand in front of 
the control panel of the electrical panel remaining distant and not 
exposed to the under pressure parts of the cooling circuit

ATTENTION
When having to take measurements with the machine on and the 
electrical panel and cooling circuit open, be careful since the machine is 
live, the cooling circuit contains high pressure gas, the pipes may be hot 
or cold, some parts may be in motion. 

Any absorption measurements of the compressors, compressor casings, 
pumps and fans as well as the power supply measurements, must be taken 
as follows:
-  With machine off, access its panel;
-  Connect the measuring instruments such as current clamps (to me-

asure the current) and multimeters (to measure the voltage). These 
instruments must be fitted with appropriate terminals/clamps that 
allow to remotely control the measurement;

-  Access the machine and read the measurements made by the instru-

ments, keeping AWAY from live electrical parts;

-  As soon as the measurements are taken, turn off the machine, remo-

ve the instruments and close the electrical panel.

The measurements of the compressor inlet and outlet temperature and 
pressure to determine the overheating and subcooling of the machine, 
must be carried out as follows:

-  With machine off, access its cooling circuit;
-  Connect the necessary instruments,
 

• Pressure gauges connected through appropriate extensions to the 
compressor inlet and outlet pressure plugs;

 

• Thermometers connected to thermocouple probes that are fixed 
to the compressor inlet and outlet pipes. Avoid using metratast that 
require the operator to near the machine cooling circuit;

-   Access the machines 

and acquire the measurements, keeping 

AWAY from the under pressure parts of the cooling circuit;

-   As soon as the measurements are taken, turn off the machine, remo-

Содержание NRB 0282 Series

Страница 1: ...tion and Maintenance Manual TRANSLATION FROM ORIGINAL 19 02 5723710_03 NRB 0282 0754 AIR CONDENSING CHILLER OUTDOOR INSTALLATION HIGH SEASONAL EFFICIENCY REDUCED AMOUNT OF REFRIGERANT COMPACT DIMENSIO...

Страница 2: ......

Страница 3: ...est grade materials and with cutting edge technology The quality level is being constantly monitored so AERMEC products are synonymous with Safety Quality and Reliability The data may undergo modifica...

Страница 4: ...NAL AND EXTERNAL HYDRAULIC CIRCUIT NRB 01 03 05 07 WITH PUMP STORAGE TANK 37 INTERNAL AND EXTERNAL HYDRAULIC CIRCUIT NRB 02 04 06 08 WITH DOUBLE PUMP STORAGE TANK 38 INTERNAL AND EXTERNAL HYDRAULIC CI...

Страница 5: ...dichiarazione di conformit rilasciata sotto la responsabilit esclusiva del fabbricante This declaration of conformity has been released under the exclusive responsibility of the manufacturer La d cla...

Страница 6: ...tenti The relevant technical documentation is compiled in accordance with part B of Annex VII this documentation or part of it will be transmitted by mail in response to a reasoned request by the nati...

Страница 7: ...igerant leaks Before commissioning check for leaks and make any necessary repairs The installation must comply with the requirements of EN378 3 and the local current regulations In particular indoor i...

Страница 8: ...nd pollute the aquifer PreVentions Make sure that the protections of mobile elements are correctly in place before restarting the unit Fans motors and belt drives may be in motion always wait for them...

Страница 9: ...loaded with refrigerant make sure there have been no leaks Check that the equipment supplied corresponds to the order and delivery note Product identification The Aermec products can be identified by...

Страница 10: ...0752 0704 0754 L A E HANDLING NRB 0282 0302 0332 0352 0502 0552 0602 0652 0682 0604 0654 L A E U N NRB 0702 0752 0704 0754 L A E HANDLING AND LIFTING NRB 0702 0752 0704 0754 U N ATTENTION The unit co...

Страница 11: ...f the unit with a full refrigerant load as well as the occasional presence of the normal maintenance equipment In locations exposed to frost if the unit is installed on soil the support base must rest...

Страница 12: ...12 DIMENSIONS mm 0282 e _0302 l 0282 L...

Страница 13: ...13 0282 n _0302 e _0332 l 0302 n _0332 e n _0352 l e...

Страница 14: ...14 0352 n _0502 l a e u n _0552 l a e u n _0602 l a e _0652 l a e 0602 u n _0652 u n _0682 l a e u n _0702 l a e _0752 l a e...

Страница 15: ...15 0604 l a e _0654 l 0604 u n _0654 a e u n _0704 l a e _0754 l a e...

Страница 16: ...16 0702 u n _0752 u n 0704 u n _0754 u n...

Страница 17: ...P4 I1 I4 K1 K4 W1 W4 Hydraulic connections with grooved joints 2 1 2 DN65 76 1 mm 2 IN 00 Hydraulic connections with grooved joints2 1 2 DN65 76 1 mm 3 OUT Hydraulic connections with grooved joints2...

Страница 18: ...n LEGEND 1 IN 01 09 P1 P4 I1 I4 K1 K4 W1 W4 Hydraulic connections with grooved joints 2 1 2 DN65 76 1 mm 2 IN 00 Hydraulic connections with grooved joints 2 1 2 DN65 76 1 mm 3 OUT Hydraulic connection...

Страница 19: ...19 WEIGHT DISTRIBUTION LAYOUT 1 LAYOUT 2 LAYOUT 3 bottom view bottom view bottom view YG XG YG XG YG XG...

Страница 20: ...20 bottom view bottom view LAYOUT 4 LAYOUT 5 YG XG YG XG...

Страница 21: ...Layout 2 876 1301 557 28 7 29 4 20 7 21 2 VT 17 0332 L P1 P3 Operationweight Layout 2 917 1336 517 29 9 26 6 23 1 20 5 VT 17 0332 L P2 P4 Operationweight Layout 2 977 1376 516 29 0 25 6 24 1 21 3 VT...

Страница 22: ...ght package Layout 4 1267 1686 560 29 4 30 4 19 7 20 5 0682 L P1 P3 Emptyweight package Layout 4 1347 1811 531 28 9 27 0 22 8 21 3 0682 L P2 P4 Emptyweight package Layout 4 1426 1888 529 27 8 25 7 24...

Страница 23: ...16 3 14 8 21 9 19 9 14 1 12 9 VT 11 0654 L 02 04 06 08 Operationweight Layout 3 1710 1613 524 15 8 14 3 22 2 20 2 14 4 13 1 VT 11 0704 L 00 Emptyweight package Layout 4 1331 1754 568 27 9 29 8 20 5 21...

Страница 24: ...555 28 6 29 2 20 9 21 3 VT 17 0332 E P1 P3 Operation weight Layout 2 940 1340 517 29 8 26 4 23 2 20 6 VT 17 0332 E P2 P4 Operation weight Layout 2 1000 1380 516 28 9 25 5 24 2 21 4 VT 17 0332 E 01 03...

Страница 25: ...ht package Layout 4 1347 1722 561 28 7 29 9 20 2 21 1 0682 A E P1 P3 Empty weight package Layout 4 1427 1838 534 28 3 26 7 23 1 21 8 0682 A E P2 P4 Empty weight package Layout 4 1506 1909 532 27 3 25...

Страница 26: ...7 5 6 7 31 0 27 8 14 2 12 7 VT 22 0654 A E 02 04 06 08 Operation weight Layout 4 1820 2009 519 7 1 6 4 31 2 27 9 14 5 12 9 VT 22 0704 A E 00 Empty weight package Layout 4 1410 1784 566 27 5 29 2 21 0...

Страница 27: ...N P1 P3 Operation weight Layout 2 985 1354 519 29 4 26 2 23 4 20 9 VT 17 0332 N P2 P4 Operation weight Layout 2 1045 1391 518 28 5 25 4 24 4 21 7 VT 17 0332 N 01 03 05 07 Operation weight Layout 2 128...

Страница 28: ...23 4 22 3 0682 U N P2 P4 Empty weight package Layout 4 1585 1928 535 26 8 25 4 24 5 23 2 0682 U N 01 03 05 07 Empty weight package Layout 4 1538 1836 536 28 3 26 8 23 0 21 9 0682 U N 02 04 06 08 Empty...

Страница 29: ...T 22 0704 U N 00 Empty weight package Layout 5 1549 2254 567 15 5 16 5 8 4 8 9 19 7 18 5 6 1 6 4 0704 U N P1 P3 Empty weight package Layout 5 1629 2293 541 15 5 15 0 8 1 7 9 20 5 21 2 6 0 5 8 0704 U N...

Страница 30: ...38 40 38 42 46 49 E kg 25 28 30 30 29 29 31 31 38 38 40 38 42 46 49 U kg 29 29 31 35 38 40 45 45 46 49 55 57 N kg 28 30 30 29 29 31 35 38 40 45 45 46 49 55 57 WEIGHT OPTION T operation weight kg 183...

Страница 31: ...mm 1100 C1 mm 800 C2 mm 800 Minimum technical spaces Minimum technical spaces A1 C B B1 C1 B2 C2 A A1 C B B1 C1 B2 C2 A NRB 0282 L NRB 0282 E N NRB 0302 L E NRB 0332 L NRB 0302 U N NRB 0332 A E U N NR...

Страница 32: ...E U N NRB 0602 L A E NRB 0652 L A E NRB 0604 L A E NRB 0654 L NRB 0602 U N NRB 0652 U N NRB 0682 L A E U N NRB 0702 L A E NRB 0752 L A E NRB 0604 U N NRB 0654 A E U N NRB 0704 L A E NRB 0754 L A E NR...

Страница 33: ...h concentration of glycol could stuck the pump Do not use the pump to mix water and glycol HYDRAULIC CONNECTIONS The units may be available with or without integrated hydronic kit in any case ATTENTIO...

Страница 34: ...LITY OFTHE INSTALLER 3 Antifreeze electric heater 5 Air vent valve 9 Drain valve 10 Anti vibration joints 11 Cut off valve 12 Pump 13 Expansion Tank 14 System buffer tank installation recommended when...

Страница 35: ...T RESPONSIBILITY OFTHE INSTALLER 3 Antifreeze electric heater 5 Air vent valve 7 Drain valve 8 Cut off valve 13 Anti vibration joints 14 System buffer tank installation recommended whenever the system...

Страница 36: ...D EXTERNALTO UNIT RESPONSIBILITY OFTHE INSTALLER 3 Antifreeze electric heater 5 Air vent valve 8 Drain valve 9 Cut off valve 14 Anti vibration joints 15 System buffer tank installation recommended whe...

Страница 37: ...7 Storage tanks with holes for supplementary heaters not provided are sent from the factory with plastic protection caps Before loading the system if the installation of one or all resistances is not...

Страница 38: ...tifreeze electric heater standard in the heat exchanger and storage tank 4 Water filter 5 Air vent valve 6 One way valve 7 Pump 8 Drain valve 9 Cut off valve 10 System buffer tank 11 Expansion Tank 12...

Страница 39: ...nium ions NH4 none Silica SiO2 30ppm 1 3 2 2 7 7 8 8 8 8 11 3 10 14 14 15 4 5 6 6 7 9 12 13 Unit Components recommended COMPONENTS PROVIDED AS STANDARD 1 Plate heat exchanger 2 Water temperature senso...

Страница 40: ...on the circuit compatible with the machine limits The system automatically modulates the number of pump rotations and therefore the water flow rate on the basis of the pressure difference measured on...

Страница 41: ...920 36953 43472 48871 E l h 14898 16820 18940 21960 24679 27171 30470 32581 39685 43783 48170 30074 35627 41357 46152 U l h 22779 25691 28817 32493 36107 42189 47065 51537 33916 37610 44381 49878 N l...

Страница 42: ...t the minimum water fl ow rate COMPONENTS PROVIDED AS STANDARD 1 Plate heat exchanger 2 Water temperature sensors 3 Antifreeze electric heater standard in the heat exchanger and storage tank 4 Diff er...

Страница 43: ...glycol near the suction of the pump High concentration of glycol could stuck the pump Do not use the pump to mix water and glycol COMPONENTS PROVIDED AS STANDARD 1 Plate heat exchanger 2 Water temper...

Страница 44: ...appliance To make an effective earth connection The manufacturer cannot be considered responsible for any damage caused by the lack of or ineffective appliance earth connection For units with three p...

Страница 45: ...3 41 6 33 6 33 7 62 3 41 3 41 6 33 7 62 High head P3 P4 03 04 07 08 I3 I4 K3 K4 Max power kW 2 56 2 56 2 56 2 56 2 56 2 56 3 40 3 40 5 93 5 93 5 93 3 40 3 40 5 93 5 93 Max current A 4 53 4 53 4 53 4 5...

Страница 46: ...unit take the power supply cable to the electric control board inside the unit and connect it to clamps L1 L2 L3 N if present and PE respecting the polarities L1 L2 L3 and N as phases and PE as groun...

Страница 47: ...AUXILIARY CONTROL BOARD Key the auxiliary control board points highlighted with a circle are the ones that the installer can use 0 1 remote ON OFF EMF Multi purpose input just the enabling chiller pow...

Страница 48: ...e cut o valve at the output of the heat exchanger the unit control panel must show the block Finally re open the valve and rearm the block COMMISSIONING Once all the aforemen oned checks have been car...

Страница 49: ...o 3 for blocking in open position Place a sign reading Do not turn on maintenance in progress on the open isolator Equip yourself with the appropriate personal protective equipment helmet insulated gl...

Страница 50: ...ing coil or any other heavy element make sure that the lifting devices are compati ble with the weight to be handled In air units with independent compressor compartment do not access the fan compartm...

Страница 51: ...ling circuit compartment The high low pressure switch where present must be tested with the machine closed reading the high pressure circuit pressure on the machine control panel In case of machines w...

Страница 52: ...ne with specific products General cleaning of the unit Bleed the hydraulic circuit and the heat exchangers the simultaneous presence of air and water reduces yield and can benefit the arising of rust...

Страница 53: ...valve Check the charge of refrigerant gas 1 Check the proper functioning of the solenoid valves MAINTENANCE LIST OF THE RECOMMENDED PERIODIC INTERVENTIONS DECOMMISSIONING AND DISPOSAL OF THE MACHINE C...

Страница 54: ...lth from uncontrolled disposal of Waste Electrical and Electronic Equipment WEEE please return the device using appropriate collection systems or contact the retailer where the product was purchased P...

Страница 55: ......

Страница 56: ...C S p A Via Roma 996 37040 Bevilacqua VR Italia Tel 39 0442 633111 Fax 39 0442 93577 marketing aermec com www aermec com Aermec reserves the right to make all modification deemed necessary for improvi...

Отзывы: