AERMEC NRB 0282 Series Скачать руководство пользователя страница 28

28

Size

NRB

Version

Hydronic kit

Weight

Layout

*

Weight

Centre of mass

Percentage distribution of weights on supports 

VT

X

Y

1

2

3

4

5

6

7

8

Kg

mm

mm

%

%

%

%

%

%

%

%

0552

U/N

00

Operation weight

Layout 3

1114

1565

540

20,2%

19,4%

14,1%

13,6%

16,6%

16,0%

-

-

VT 11

0552

U/N

P1, P3

Operation weight

Layout 3

1155

1625

511

20,7%

18,0%

12,5%

10,8%

20,4%

17,7%

-

-

VT 11

0552

U/N

P2, P4

Operation weight

Layout 3

1203

1664

510

19,9%

17,2%

12,0%

10,4%

21,7%

18,8%

-

-

VT 11

0552

U/N

01, 03, 05, 07

Operation weight

Layout 3

1566

1666

508

13,9%

11,9%

24,7%

21,2%

15,2%

13,1%

-

-

VT 11

0552

U/N

02, 04, 06, 08

Operation weight

Layout 3

1612

1679

508

13,4%

11,4%

25,0%

21,4%

15,5%

13,3%

-

-

VT 11

0602

U/N

00

Empty package

Layout 4

1232

1835

578

26,2%

29,0%

-

-

21,3%

23,6%

-

-

-

0602

U/N

P1, P3

Empty package

Layout 4

1273

1916

548

26,4%

26,2%

-

-

23,8%

23,6%

-

-

-

0602

U/N

P2, P4

Empty package

Layout 4

1313

1955

547

25,8%

25,6%

-

-

24,4%

24,2%

-

-

-

0602

U/N

01, 03, 05, 07

Empty package

Layout 4

1304

1897

547

26,7%

26,5%

-

-

23,5%

23,3%

-

-

-

0602

U/N

02, 04, 06, 08

Empty package

Layout 4

1342

1923

546

26,4%

26,0%

-

-

24,0%

23,6%

-

-

-

0602

U/N

00

Operation weight

Layout 4

1234

1884

559

10,8%

11,1%

25,5%

26,3%

13,0%

13,4%

-

-

VT 22

0602

U/N

P1, P3

Operation weight

Layout 4

1275

1963

530

11,1%

10,4%

25,1%

23,3%

15,6%

14,5%

-

-

VT 22

0602

U/N

P2, P4

Operation weight

Layout 4

1323

2008

529

10,6%

9,8%

24,9%

23,1%

16,4%

15,2%

-

-

VT 22

0602

U/N

01, 03, 05, 07

Operation weight

Layout 4

1684

2060

523

5,8%

5,3%

31,7%

28,7%

14,9%

13,5%

-

-

VT 22

0602

U/N

02, 04, 06, 08

Operation weight

Layout 4

1730

2079

522

5,4%

4,9%

31,9%

28,8%

15,2%

13,7%

-

-

VT 22

0652

U/N

00

Empty package

Layout 4

1243

1831

579

26,2%

29,1%

-

-

21,2%

23,5%

-

-

-

0652

U/N

P1, P3

Empty package

Layout 4

1284

1911

550

26,4%

26,4%

-

-

23,6%

23,6%

-

-

-

0652

U/N

P2, P4

Empty package

Layout 4

1324

1950

549

25,8%

25,7%

-

-

24,3%

24,2%

-

-

-

0652

U/N

01, 03, 05, 07

Empty package

Layout 4

1316

1892

549

26,7%

26,6%

-

-

23,3%

23,3%

-

-

-

0652

U/N

02, 04, 06, 08

Empty package

Layout 4

1354

1917

548

26,4%

26,2%

-

-

23,8%

23,6%

-

-

-

0652

U/N

00

Operation weight

Layout 4

1256

1884

556

10,7%

10,9%

25,9%

26,5%

12,9%

13,2%

-

-

VT 22

0652

U/N

P1, P3

Operation weight

Layout 4

1297

1962

528

11,0%

10,2%

25,5%

23,5%

15,5%

14,3%

-

-

VT 22

0652

U/N

P2, P4

Operation weight

Layout 4

1345

2006

527

10,5%

9,6%

25,3%

23,3%

16,3%

15,1%

-

-

VT 22

0652

U/N

01, 03, 05, 07

Operation weight

Layout 4

1705

2058

522

5,8%

5,2%

31,9%

28,8%

14,9%

13,4%

-

-

VT 22

0652

U/N

02, 04, 06, 08

Operation weight

Layout 4

1751

2076

521

5,4%

4,9%

32,1%

28,9%

15,1%

13,6%

-

-

VT 22

0682

U/N

00

Empty package

Layout 4

1426

1754

562

28,2%

29,5%

-

-

20,7%

21,6%

-

-

-

0682

U/N

P1, P3

Empty package

Layout 4

1506

1862

537

27,8%

26,5%

-

-

23,4%

22,3%

-

-

-

0682

U/N

P2, P4

Empty package

Layout 4

1585

1928

535

26,8%

25,4%

-

-

24,5%

23,2%

-

-

-

0682

U/N

01, 03, 05, 07

Empty package

Layout 4

1538

1836

536

28,3%

26,8%

-

-

23,0%

21,9%

-

-

-

0682

U/N

02, 04, 06, 08

Empty package

Layout 4

1615

1882

534

27,6%

26,1%

-

-

23,8%

22,5%

-

-

-

0682

U/N

00

Operation weight

Layout 4

1450

1806

539

12,9%

12,4%

25,6%

24,6%

12,5%

12,0%

-

-

VT 22

0682

U/N

P1, P3

Operation weight

Layout 4

1530

1910

515

12,7%

11,2%

25,1%

22,0%

15,4%

13,5%

-

-

VT 22

0682

U/N

P2, P4

Operation weight

Layout 4

1617

1979

514

11,8%

10,4%

24,8%

21,7%

16,7%

14,6%

-

-

VT 22

0682

U/N

01, 03, 05, 07

Operation weight

Layout 4

1938

1997

512

7,6%

6,6%

31,3%

27,2%

14,6%

12,7%

-

-

VT 22

0682

U/N

02, 04, 06, 08

Operation weight

Layout 4

2023

2030

511

6,9%

6,0%

31,6%

27,4%

15,0%

13,1%

-

-

VT 22

0702

U/N

00

Empty package

Layout 5

1647

2132

564

18,2%

19,2%

6,3%

6,6%

19,5%

18,6%

5,6%

5,9%

-

0702

U/N

P1, P3

Empty package

Layout 5

1727

2173

540

18,2%

17,5%

6,1%

5,9%

20,3%

21,0%

5,6%

5,4%

-

0702

U/N

P2, P4

Empty package

Layout 5

1806

2218

538

17,5%

16,7%

5,5%

5,2%

21,7%

22,7%

5,5%

5,2%

-

0702

U/N

01, 03, 05, 07

Empty package

Layout 5

1757

2143

539

17,8%

17,1%

8,5%

8,1%

18,9%

19,6%

5,1%

4,9%

-

0702

U/N

02, 04, 06, 08

Empty package

Layout 5

1834

2171

537

17,0%

16,3%

8,7%

8,3%

19,6%

20,5%

4,9%

4,7%

-

0702

U/N

00

Operation weight

Layout 5

1672

2171

543

17,5%

17,1%

8,3%

8,1%

20,0%

20,5%

4,3%

4,2%

VT 23

0702

U/N

P1, P3

Operation weight

Layout 5

1752

2210

520

17,4%

15,6%

8,5%

7,6%

20,3%

22,6%

4,2%

3,8%

VT 23

0702

U/N

P2, P4

Operation weight

Layout 5

1839

2257

519

16,6%

14,8%

8,1%

7,2%

21,6%

24,1%

4,0%

3,6%

VT 23

0702

U/N

01, 03, 05, 07

Operation weight

Layout 5

2157

2228

517

13,5%

11,9%

15,0%

13,3%

19,3%

21,8%

2,7%

2,4%

VT 23

0702

U/N

02, 04, 06, 08

Operation weight

Layout 5

2242

2249

516

12,9%

11,4%

15,3%

13,5%

19,8%

22,4%

2,5%

2,2%

VT 23

0752

U/N

00

Empty package

Layout 5

1660

2119

561

18,5%

19,3%

6,3%

6,6%

19,3%

18,5%

5,6%

5,9%

-

0752

U/N

P1, P3

Empty package

Layout 5

1740

2161

537

18,5%

17,7%

6,1%

5,8%

20,0%

21,0%

5,6%

5,3%

-

0752

U/N

P2, P4

Empty package

Layout 5

1819

2206

536

17,8%

16,9%

5,5%

5,2%

21,5%

22,6%

5,4%

5,2%

-

0752

U/N

01, 03, 05, 07

Empty package

Layout 5

1769

2131

537

18,1%

17,2%

8,4%

8,1%

18,6%

19,6%

5,1%

4,9%

-

0752

U/N

02, 04, 06, 08

Empty package

Layout 5

1846

2159

535

17,3%

16,4%

8,6%

8,2%

19,4%

20,5%

4,9%

4,6%

-

0752

U/N

00

Operation weight

Layout 5

1685

2158

541

17,8%

17,3%

8,3%

8,0%

19,7%

20,4%

4,3%

4,2%

VT 23

0752

U/N

P1, P3

Operation weight

Layout 5

1765

2198

518

17,7%

15,8%

8,5%

7,5%

20,1%

22,6%

4,2%

3,7%

VT 23

0752

U/N

P2, P4

Operation weight

Layout 5

1852

2245

518

16,9%

15,0%

8,1%

7,2%

21,3%

24,0%

4,0%

3,5%

VT 23

0752

U/N

01, 03, 05, 07

Operation weight

Layout 5

2170

2218

515

13,8%

12,1%

15,0%

13,2%

19,1%

21,7%

2,7%

2,4%

VT 23

0752

U/N

02, 04, 06, 08

Operation weight

Layout 5

2255

2239

514

13,2%

11,6%

15,2%

13,4%

19,6%

22,4%

2,5%

2,2%

VT 23

Содержание NRB 0282 Series

Страница 1: ...tion and Maintenance Manual TRANSLATION FROM ORIGINAL 19 02 5723710_03 NRB 0282 0754 AIR CONDENSING CHILLER OUTDOOR INSTALLATION HIGH SEASONAL EFFICIENCY REDUCED AMOUNT OF REFRIGERANT COMPACT DIMENSIO...

Страница 2: ......

Страница 3: ...est grade materials and with cutting edge technology The quality level is being constantly monitored so AERMEC products are synonymous with Safety Quality and Reliability The data may undergo modifica...

Страница 4: ...NAL AND EXTERNAL HYDRAULIC CIRCUIT NRB 01 03 05 07 WITH PUMP STORAGE TANK 37 INTERNAL AND EXTERNAL HYDRAULIC CIRCUIT NRB 02 04 06 08 WITH DOUBLE PUMP STORAGE TANK 38 INTERNAL AND EXTERNAL HYDRAULIC CI...

Страница 5: ...dichiarazione di conformit rilasciata sotto la responsabilit esclusiva del fabbricante This declaration of conformity has been released under the exclusive responsibility of the manufacturer La d cla...

Страница 6: ...tenti The relevant technical documentation is compiled in accordance with part B of Annex VII this documentation or part of it will be transmitted by mail in response to a reasoned request by the nati...

Страница 7: ...igerant leaks Before commissioning check for leaks and make any necessary repairs The installation must comply with the requirements of EN378 3 and the local current regulations In particular indoor i...

Страница 8: ...nd pollute the aquifer PreVentions Make sure that the protections of mobile elements are correctly in place before restarting the unit Fans motors and belt drives may be in motion always wait for them...

Страница 9: ...loaded with refrigerant make sure there have been no leaks Check that the equipment supplied corresponds to the order and delivery note Product identification The Aermec products can be identified by...

Страница 10: ...0752 0704 0754 L A E HANDLING NRB 0282 0302 0332 0352 0502 0552 0602 0652 0682 0604 0654 L A E U N NRB 0702 0752 0704 0754 L A E HANDLING AND LIFTING NRB 0702 0752 0704 0754 U N ATTENTION The unit co...

Страница 11: ...f the unit with a full refrigerant load as well as the occasional presence of the normal maintenance equipment In locations exposed to frost if the unit is installed on soil the support base must rest...

Страница 12: ...12 DIMENSIONS mm 0282 e _0302 l 0282 L...

Страница 13: ...13 0282 n _0302 e _0332 l 0302 n _0332 e n _0352 l e...

Страница 14: ...14 0352 n _0502 l a e u n _0552 l a e u n _0602 l a e _0652 l a e 0602 u n _0652 u n _0682 l a e u n _0702 l a e _0752 l a e...

Страница 15: ...15 0604 l a e _0654 l 0604 u n _0654 a e u n _0704 l a e _0754 l a e...

Страница 16: ...16 0702 u n _0752 u n 0704 u n _0754 u n...

Страница 17: ...P4 I1 I4 K1 K4 W1 W4 Hydraulic connections with grooved joints 2 1 2 DN65 76 1 mm 2 IN 00 Hydraulic connections with grooved joints2 1 2 DN65 76 1 mm 3 OUT Hydraulic connections with grooved joints2...

Страница 18: ...n LEGEND 1 IN 01 09 P1 P4 I1 I4 K1 K4 W1 W4 Hydraulic connections with grooved joints 2 1 2 DN65 76 1 mm 2 IN 00 Hydraulic connections with grooved joints 2 1 2 DN65 76 1 mm 3 OUT Hydraulic connection...

Страница 19: ...19 WEIGHT DISTRIBUTION LAYOUT 1 LAYOUT 2 LAYOUT 3 bottom view bottom view bottom view YG XG YG XG YG XG...

Страница 20: ...20 bottom view bottom view LAYOUT 4 LAYOUT 5 YG XG YG XG...

Страница 21: ...Layout 2 876 1301 557 28 7 29 4 20 7 21 2 VT 17 0332 L P1 P3 Operationweight Layout 2 917 1336 517 29 9 26 6 23 1 20 5 VT 17 0332 L P2 P4 Operationweight Layout 2 977 1376 516 29 0 25 6 24 1 21 3 VT...

Страница 22: ...ght package Layout 4 1267 1686 560 29 4 30 4 19 7 20 5 0682 L P1 P3 Emptyweight package Layout 4 1347 1811 531 28 9 27 0 22 8 21 3 0682 L P2 P4 Emptyweight package Layout 4 1426 1888 529 27 8 25 7 24...

Страница 23: ...16 3 14 8 21 9 19 9 14 1 12 9 VT 11 0654 L 02 04 06 08 Operationweight Layout 3 1710 1613 524 15 8 14 3 22 2 20 2 14 4 13 1 VT 11 0704 L 00 Emptyweight package Layout 4 1331 1754 568 27 9 29 8 20 5 21...

Страница 24: ...555 28 6 29 2 20 9 21 3 VT 17 0332 E P1 P3 Operation weight Layout 2 940 1340 517 29 8 26 4 23 2 20 6 VT 17 0332 E P2 P4 Operation weight Layout 2 1000 1380 516 28 9 25 5 24 2 21 4 VT 17 0332 E 01 03...

Страница 25: ...ht package Layout 4 1347 1722 561 28 7 29 9 20 2 21 1 0682 A E P1 P3 Empty weight package Layout 4 1427 1838 534 28 3 26 7 23 1 21 8 0682 A E P2 P4 Empty weight package Layout 4 1506 1909 532 27 3 25...

Страница 26: ...7 5 6 7 31 0 27 8 14 2 12 7 VT 22 0654 A E 02 04 06 08 Operation weight Layout 4 1820 2009 519 7 1 6 4 31 2 27 9 14 5 12 9 VT 22 0704 A E 00 Empty weight package Layout 4 1410 1784 566 27 5 29 2 21 0...

Страница 27: ...N P1 P3 Operation weight Layout 2 985 1354 519 29 4 26 2 23 4 20 9 VT 17 0332 N P2 P4 Operation weight Layout 2 1045 1391 518 28 5 25 4 24 4 21 7 VT 17 0332 N 01 03 05 07 Operation weight Layout 2 128...

Страница 28: ...23 4 22 3 0682 U N P2 P4 Empty weight package Layout 4 1585 1928 535 26 8 25 4 24 5 23 2 0682 U N 01 03 05 07 Empty weight package Layout 4 1538 1836 536 28 3 26 8 23 0 21 9 0682 U N 02 04 06 08 Empty...

Страница 29: ...T 22 0704 U N 00 Empty weight package Layout 5 1549 2254 567 15 5 16 5 8 4 8 9 19 7 18 5 6 1 6 4 0704 U N P1 P3 Empty weight package Layout 5 1629 2293 541 15 5 15 0 8 1 7 9 20 5 21 2 6 0 5 8 0704 U N...

Страница 30: ...38 40 38 42 46 49 E kg 25 28 30 30 29 29 31 31 38 38 40 38 42 46 49 U kg 29 29 31 35 38 40 45 45 46 49 55 57 N kg 28 30 30 29 29 31 35 38 40 45 45 46 49 55 57 WEIGHT OPTION T operation weight kg 183...

Страница 31: ...mm 1100 C1 mm 800 C2 mm 800 Minimum technical spaces Minimum technical spaces A1 C B B1 C1 B2 C2 A A1 C B B1 C1 B2 C2 A NRB 0282 L NRB 0282 E N NRB 0302 L E NRB 0332 L NRB 0302 U N NRB 0332 A E U N NR...

Страница 32: ...E U N NRB 0602 L A E NRB 0652 L A E NRB 0604 L A E NRB 0654 L NRB 0602 U N NRB 0652 U N NRB 0682 L A E U N NRB 0702 L A E NRB 0752 L A E NRB 0604 U N NRB 0654 A E U N NRB 0704 L A E NRB 0754 L A E NR...

Страница 33: ...h concentration of glycol could stuck the pump Do not use the pump to mix water and glycol HYDRAULIC CONNECTIONS The units may be available with or without integrated hydronic kit in any case ATTENTIO...

Страница 34: ...LITY OFTHE INSTALLER 3 Antifreeze electric heater 5 Air vent valve 9 Drain valve 10 Anti vibration joints 11 Cut off valve 12 Pump 13 Expansion Tank 14 System buffer tank installation recommended when...

Страница 35: ...T RESPONSIBILITY OFTHE INSTALLER 3 Antifreeze electric heater 5 Air vent valve 7 Drain valve 8 Cut off valve 13 Anti vibration joints 14 System buffer tank installation recommended whenever the system...

Страница 36: ...D EXTERNALTO UNIT RESPONSIBILITY OFTHE INSTALLER 3 Antifreeze electric heater 5 Air vent valve 8 Drain valve 9 Cut off valve 14 Anti vibration joints 15 System buffer tank installation recommended whe...

Страница 37: ...7 Storage tanks with holes for supplementary heaters not provided are sent from the factory with plastic protection caps Before loading the system if the installation of one or all resistances is not...

Страница 38: ...tifreeze electric heater standard in the heat exchanger and storage tank 4 Water filter 5 Air vent valve 6 One way valve 7 Pump 8 Drain valve 9 Cut off valve 10 System buffer tank 11 Expansion Tank 12...

Страница 39: ...nium ions NH4 none Silica SiO2 30ppm 1 3 2 2 7 7 8 8 8 8 11 3 10 14 14 15 4 5 6 6 7 9 12 13 Unit Components recommended COMPONENTS PROVIDED AS STANDARD 1 Plate heat exchanger 2 Water temperature senso...

Страница 40: ...on the circuit compatible with the machine limits The system automatically modulates the number of pump rotations and therefore the water flow rate on the basis of the pressure difference measured on...

Страница 41: ...920 36953 43472 48871 E l h 14898 16820 18940 21960 24679 27171 30470 32581 39685 43783 48170 30074 35627 41357 46152 U l h 22779 25691 28817 32493 36107 42189 47065 51537 33916 37610 44381 49878 N l...

Страница 42: ...t the minimum water fl ow rate COMPONENTS PROVIDED AS STANDARD 1 Plate heat exchanger 2 Water temperature sensors 3 Antifreeze electric heater standard in the heat exchanger and storage tank 4 Diff er...

Страница 43: ...glycol near the suction of the pump High concentration of glycol could stuck the pump Do not use the pump to mix water and glycol COMPONENTS PROVIDED AS STANDARD 1 Plate heat exchanger 2 Water temper...

Страница 44: ...appliance To make an effective earth connection The manufacturer cannot be considered responsible for any damage caused by the lack of or ineffective appliance earth connection For units with three p...

Страница 45: ...3 41 6 33 6 33 7 62 3 41 3 41 6 33 7 62 High head P3 P4 03 04 07 08 I3 I4 K3 K4 Max power kW 2 56 2 56 2 56 2 56 2 56 2 56 3 40 3 40 5 93 5 93 5 93 3 40 3 40 5 93 5 93 Max current A 4 53 4 53 4 53 4 5...

Страница 46: ...unit take the power supply cable to the electric control board inside the unit and connect it to clamps L1 L2 L3 N if present and PE respecting the polarities L1 L2 L3 and N as phases and PE as groun...

Страница 47: ...AUXILIARY CONTROL BOARD Key the auxiliary control board points highlighted with a circle are the ones that the installer can use 0 1 remote ON OFF EMF Multi purpose input just the enabling chiller pow...

Страница 48: ...e cut o valve at the output of the heat exchanger the unit control panel must show the block Finally re open the valve and rearm the block COMMISSIONING Once all the aforemen oned checks have been car...

Страница 49: ...o 3 for blocking in open position Place a sign reading Do not turn on maintenance in progress on the open isolator Equip yourself with the appropriate personal protective equipment helmet insulated gl...

Страница 50: ...ing coil or any other heavy element make sure that the lifting devices are compati ble with the weight to be handled In air units with independent compressor compartment do not access the fan compartm...

Страница 51: ...ling circuit compartment The high low pressure switch where present must be tested with the machine closed reading the high pressure circuit pressure on the machine control panel In case of machines w...

Страница 52: ...ne with specific products General cleaning of the unit Bleed the hydraulic circuit and the heat exchangers the simultaneous presence of air and water reduces yield and can benefit the arising of rust...

Страница 53: ...valve Check the charge of refrigerant gas 1 Check the proper functioning of the solenoid valves MAINTENANCE LIST OF THE RECOMMENDED PERIODIC INTERVENTIONS DECOMMISSIONING AND DISPOSAL OF THE MACHINE C...

Страница 54: ...lth from uncontrolled disposal of Waste Electrical and Electronic Equipment WEEE please return the device using appropriate collection systems or contact the retailer where the product was purchased P...

Страница 55: ......

Страница 56: ...C S p A Via Roma 996 37040 Bevilacqua VR Italia Tel 39 0442 633111 Fax 39 0442 93577 marketing aermec com www aermec com Aermec reserves the right to make all modification deemed necessary for improvi...

Отзывы: