Responsibilities for different activities on the device must of course be determined
and kept. Unclear competences are a safety hazard.
The operator must make the operating instruction available for the user and make
sure that the user did understand the manual.
4.Installation and transport
The DH18-series is planned for the stationary and mobile effort. During the setting
up and transportation of the dehumidifier, the following items are to be considered:
Ø
The dehumidifier must be installed so that the air can circulate without
obstruction through it. The air filter and also the outlet grille must not be covered.
The open space before the outlet grille and the air filter must at least conduct 1
meter.
Ø
Before every local alternation of the device, switch off the device at the on/off-
switch, pull the power plug from the socket and empty the water tank!
Ø
The air dryer must be moved only using the provided wheels and handhold!
Ø
The air dryer must be installed on a plane base only, as otherwise it must be
secured against rolling off!
Ø
That dehumidifier can be transported upright or laid flat! The upright
transportation is to be preferred if possible.
Ø
The appliance must be used exclusively for air drying.
ATTENTION:
Do never pull or move the device at the power cable
5.Operation
5.1 Pictures and discription
1 – Cover
2 – Hygrostat
3 – Air-inlet grillet
4 – water tank
5 – Air-outlet grillet
6 – grip
7 – Air filter (easy removable to side)
8 – front cover
9 – castors (4 pcs.)
10 – cable winding
11 – condensate outlet (with stopper)
12 – main cable with plug
13 – hose