
ENGINE
4-42
8. Install intake side rocker shaft and rocker arm.
9. Install 2 dowel pins onto cylinder head.
10. Ensure the piston locate At TDC (top die center).
11. Pull cam chain fully up then install cam sprocket into
camshaft.
12. Ensure cam sprockets 2 fasten holes, which locate at
horizontal.
13. Ensure flywheel mark align with right crank cover mark
line.
14. Tight cam sprocket fastens bolt.
Serious engine damage may result if the camshaft is
not properly timed to the crankshaft.
15. Install decompressor into camshaft.
16. Apply clean engine oil liberally to the valve springs, cam
chain, rocker arms, and camshaft.
17. Adjust valves according to the “VALVE
CLEARANCE ADJUSTMENT PROCEDURES”, Page4.39.
Содержание AT56-69E
Страница 6: ...GENERAL INFORMATION 1 3 COBRA 400 Model AT56 69E Model Number RF3RA56XXCTXXXXXX Engine Model V69C ...
Страница 35: ...MAINTENANCE 2 25 ...
Страница 45: ...CVT SYSTEM 3 4 CVT EXPLODED VIEW ...
Страница 56: ...ENGINE 4 3 ENGINE ILLUSTRATION ENGINE EXPLODED VIEW ...
Страница 57: ...ENGINE 4 4 ...
Страница 58: ...ENGINE 4 5 COOLING SYSTEM EXPLODED VIEW ...
Страница 59: ...ENGINE 4 6 OIL FLOW DIAGRAM ...
Страница 125: ...FUEL AND CARBURETOR 6 15 FUEL TANK SYSTEM ...
Страница 135: ...BODY SUSPENSION STEERING 7 6 SUSPENSION ...
Страница 142: ...BODY SUSPENSION STEERING 7 13 STEERING ...
Страница 151: ...BRAKES 8 6 FRONT BRAKE EXPLODED VIEW MASTER CYLINDER ...
Страница 196: ...ELECTRICAL 9 31 WIRE DIAGRAM ...