
ENGINE
4-40
3. Install the cam chain guide and dowel pins into the cylinder.
Verify the bottom end is seated properly in the crankcase.
4. Pull the cam chain through the cylinder chain room and
secure with mechanic’s wire.
5. Position crankshaft at Top Dead Center (TDC) on
compression stroke.
6. Install 2-dowel pin onto cylinder.
CYLINDER HEAD AND CAMSHAFT
INSTALLATION
NOTE: Clean the gasket surfaces on the cylinder
head and cylinder. Remove all traces of old gasket
material.
1. Install the dowel pin(s) and a new cylinder head gasket.
2. Pull the cam chain through the cylinder head chain room
and secure with mechanic’s wire.
3. Place the cylinder head on the cylinder.
Содержание AT56-69E
Страница 6: ...GENERAL INFORMATION 1 3 COBRA 400 Model AT56 69E Model Number RF3RA56XXCTXXXXXX Engine Model V69C ...
Страница 35: ...MAINTENANCE 2 25 ...
Страница 45: ...CVT SYSTEM 3 4 CVT EXPLODED VIEW ...
Страница 56: ...ENGINE 4 3 ENGINE ILLUSTRATION ENGINE EXPLODED VIEW ...
Страница 57: ...ENGINE 4 4 ...
Страница 58: ...ENGINE 4 5 COOLING SYSTEM EXPLODED VIEW ...
Страница 59: ...ENGINE 4 6 OIL FLOW DIAGRAM ...
Страница 125: ...FUEL AND CARBURETOR 6 15 FUEL TANK SYSTEM ...
Страница 135: ...BODY SUSPENSION STEERING 7 6 SUSPENSION ...
Страница 142: ...BODY SUSPENSION STEERING 7 13 STEERING ...
Страница 151: ...BRAKES 8 6 FRONT BRAKE EXPLODED VIEW MASTER CYLINDER ...
Страница 196: ...ELECTRICAL 9 31 WIRE DIAGRAM ...