Operations Manual Thyro Power Manager
Installation
Version 2007-12-05
Page 13 of 52
4 Installation
4.1 Safety Notes
The following 5 safety rules must be complied with prior to the beginning of all work
performed to the Unit:
Attention Mains Voltage!
Safety rules for work performed to electrical facilities:
1. Disconnect equipment from the mains (establish a voltage free status)
2. Securing against re-activation
3. Determine voltage free status by measurement
4. Earthen and short-circuit equipment
5. Cover or establish borders towards neighboring parts under voltage
4.2 Scope of Delivery, Assembly
4.2.1
Scope of Delivery
The delivery is comprised of the following parts:
•
Thyro Power Manager
•
Pouch with screws / plug terminals
•
Operations Manual
4.2.2
Assembly
The Units must be assembled on the overhead rail within a switch cabinet / casing. Voltage
supply is performed at terminal X1. In the course, the connection voltage must be selected
there, and the according jumpers must be set (230V~ jumper X1.5 – X1.6; 110V~ jumper
X1.4 –X1.6 and jumper X1.5 – X1.7)
Earthing shall be performed at X1.1 or X1.2 in accordance with local regulations!
For this, see also chapter 4.5.4.1 Connection for Voltage Supply on page 16.