30
PD201809 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.2-18 EN
30
9.
Install the screws and coversof cooling bin or fan box to their original position;
10.
Install the inverter to its original position again according to section 3.
11.
Repeat the operation in section 4.1
12.
Restart the inverter.
Do not start the inverter immediately it if alarms and stops. Figure out the cause
And confirm all the faults are removed before starting the inverter again. Inspections
Should be carried out in strict accordance with the procedures in section 4.1
5. Display and operation panel
This section describes the panel display and provides instructions for display operation, including the LED indicators and
the LCD display. The LED indicators and the LCD display show the operation states and parameters. The displayed
content and parameters can also be set or modified by the operational panel.
Figure 16A: Operation Panel
LCD screen
LED indicators
Operational panel