AE Conversion INV315-50EU Скачать руководство пользователя страница 13

13

11.2019

INV315-50EU

8.4.2 Without communication

Die Micro-Inverter-Versionen ohne Kommunikation sind 
nicht für eine umfassende Überwachung bestimmt, und 
können daher nicht durch Anwendung der AEconversion 
Datalogger, Gateway oder Software verwendet werden. Um die 
grundlegenden Daten der PV-Anlage überwachen zu können, 
kann der Anwender einen unabhängigen Energie-Monitor 
installieren.

9.0 Initial operation and registration with the utility company

During commissioning, the inverter must be supplied with PV 
voltage. To start the inverter, it is also imperative that an AC 
voltage is applied which is within the respective valid tolerance 
range.

9.1 Anmeldung beim EVU

When registering and accepting the PV system, the modalities of 
the respective utility grid operator must be observed.
Commissioning usually proceeds as follows:

• 

Submission of the documents to the responsible utility 
company

• 

Installation of the system

• 

Installation of the meter by the utility company 

9.2 Acceptance of the plant by the utility company

The following documents are generally required for this:

• 

Registration / completion notification by registered installer

• 

Site plan showing the boundaries of the property and the 
installation site of the PV system

• 

General plan of the entire system with the equipment used 
(single-pole representation)

• 

Data sheet for self-generating systems

• 

Description of the protective device with information on 
type, circuit, make and function

• 

Description of the inverter or 

• 

Declaration of conformity and clearance certificate

• 

Information on the short-circuit resistance of the switching 
devices

10.0 Switching off the inverter

You must switch off the inverter for adjustment, maintenance 
and repair work. Proceed as follows:

• 

Switch off the mains voltage (deactivate the external fuse 
elements). 

• 

After switching off, check that there is no voltage

• 

Follow the local regulations for work on electrical 
installations.

  - Danger to life due to electric shock at live 

connections! 
- Even after disconnecting the electrical 
connections, life-threatening voltages are still 
present in the inverter. 
- Therefore, wait at least five minutes before 
carrying out any further work on the inverter.

11.0 External limiting

The term „external limitation“ is understood to mean the remote 
control of the output power of a PV system by the energy 
supplier or the energy supply company (EVU). 

 

According to the Renewable Energy Sources Act of 01.01.2012 
(EEG, §6), external control of the output power must be possible. 
Depending on the size of the system, 70% control can 
also be used as an alternative. 

 

 

This external power setting is carried out via ripple control 
signals. For this purpose, a ripple control receiver must be 
installed by the utility company.  

 

 

     
The signals are then forwarded to the data logger. The data logger 
has four potential-free contacts that are available for processing 
the ripple control signals and are forwarded to the connected 
inverters via the RS485 interface.  

 

 

 

 

       
Further information can be found in the installation and operating 
instructions of the data logger. 

 

 

 

     
    
The power reduction is based on the maximum AC power 
of the respective inverter in percent.  

 

 

The energy suppliers have currently agreed on four percentage 
values. 

      

      
The power specifications and their influence on the inverters can 
be seen in the following table. 

 

 

 

Содержание INV315-50EU

Страница 1: ...Micro Inverter English INV315 50EU ...

Страница 2: ...Assembly and operating instructions INV315 50EU Printed in Germany Copyright by AEconversion GmbH Co KG ...

Страница 3: ...Protection concepts 7 5 5 Network and system protection 7 6 0 Operating conditions 8 6 1 Dimensioning of the PV generator 8 7 0 Installation 8 7 1 Installation on PV racking 9 7 2 Mounting alternatives 9 8 0 Connections 9 8 1 Overview of connections 10 8 1 1 Connection areas of the inverter 10 8 2 AC Connection 10 8 1 2 AC Connection of many devices 11 8 3 DC Connection 11 8 4 Communication setup ...

Страница 4: ...tions of all parts and components of the system 2 1 General information and safety instructions The proper and safe operation of this device requires proper transport storage installation and assembly as well as careful operation and maintenance When operating this equipment certain parts of the equipment are under dangerous voltage which can cause serious bodily injury or death Therefore please f...

Страница 5: ...es not comply with the standards Improper operation Operating the units with defective protective devices Impact of foreign bodies and force majeure lightning overvoltage thunderstorms fire Insufficient or non existent ventilation of the unit Non observance of safety regulations Transport damage Use of non original PV mating plugs and sockets from the HELIOS H4 product series by Amphenol The insta...

Страница 6: ...signed for operating temperatures from 25 C to 70 C If the temperature inside the enclosure exceeds a certain value the inverter automatically regulates the maximum power to protect itself Systems with micro inverters are easy to design and install Each inverter can be mounted on the mounting rack underneath the PV modules but it is recommended to have a place where emergency service work can be e...

Страница 7: ...75sec OFF 0 25sec 1 cycle AC voltage not within tolerance range LED 1sec ON 0 75sec OFF 0 25sec 2 cycles DC voltage not within tolerance range LED 1sec ON 0 75sec OFF 0 25sec 3 cycles AC and DC voltages not within tolerance range LED 1sec ON 0 75sec OFF 0 25sec 4 cycles Internal overtemperature LED 1sec ON 0 75sec OFF 0 25sec 5 cycles Sequence ends 2 sec AUS Insulation measurement on the PV side I...

Страница 8: ... a 24V module The open circuit voltage of the entire PV generator must be less than 50 for INV315 UMpp 60 C input voltage 20 VDC for INV315 50EU The UMpp voltage of the connected string should not fall below the permitted input voltage range even at very high module temperatures 60 C If the temperature rises from 25 C to 60 C the UMpp voltage of 12 V modules drops by approx by approx 3 6 V per mod...

Страница 9: ...e help of accessories that are matched to the mounting frame As an example slot stones can be fastened to the mounting profiles at the positions below the inverter brackets with screws When mounting make sure that the inverter is mounted in the correct installation position the cover must face upwards connection plugs must point downwards 7 2 Installation alternative If mounting on the mounting fr...

Страница 10: ...reases during feed in operation This voltage is measured by the inverter If the voltage at the grid terminals exceeds the limit for grid overvoltage the inverter switches off due to grid overvoltage This circumstance must be taken into account in the AC wiring and when dimensioning the AC line When using several AC circuits in a PV system it is necessary to distribute the feed in phase symmetrical...

Страница 11: ...nnection before connecting it to the inverter Only use original mating plugs and sockets from the HELIOS H4 product range from Amphenol Observe the Amphenol assembly instructions for the DC connectors if you assemble the cables yourself Check that the PV generator is free of earth faults before connecting it to the inverter Before connecting the DC cables to the inverter check whether the maximum ...

Страница 12: ...of the inverter different procedures must be followed Please follow the communication setup procedure that is appropriate for your inverter 8 4 1 RF Communication If the micro inverter is equipped with RF communication the steps for setting up communication including wiring and monitoring are described below Communication via the RFC interface takes place via a frequency of 2 4 GHz In combination ...

Страница 13: ...e short circuit resistance of the switching devices 10 0 Switching off the inverter You must switch off the inverter for adjustment maintenance and repair work Proceed as follows Switch off the mains voltage deactivate the external fuse elements After switching off check that there is no voltage Follow the local regulations for work on electrical installations Danger to life due to electric shock ...

Страница 14: ... dirt 12 3 Laws regulations and technical rules When constructing solar installations the laws and regulations applicable to the respective country at state federal and European or international level must be observed In general the generally recognised rules of technology apply which are usually formulated in the form of standards guidelines regulations provisions and technical rules by state and...

Страница 15: ...ncy 96 European efficiency 95 MPPT efficiency 99 8 Mechanical Data Operating Temperature 25 C 70 C Night time power consumption 30 mW Max altitude a s l 2000 m DC Input Amphenol H4 AC Output female connector Wieland system RSTi mini Dimensions WxHxD 390mm x 100 mm x 30 mm Weight 0 8 kg Cooling natural convection Enclosure material aluminum Protection Degree IP65 iP67 NEMA4 50 Hz Version Nominal AC...

Страница 16: ...v T ambient 0m s P pv 30V P pv 35V P pv 40V P pv 25V 100 W 150 W 200 W 250 W 300 W 15 C 10 C 5 C 0 C 5 C 10 C 15 C 20 C 25 C 30 C PV input power T amb 0 1m s wind speed Derating diagramm Ppv T ambient 0 1 m s P pv 30V P pv 25V P pv 40V Derating diagrams for INV315 6 0 A 6 5 A 7 0 A 7 5 A 8 0 A 8 5 A 9 0 A 9 5 A 10 0 A 250 W 260 W 270 W 280 W 290 W 300 W 310 W 320 W 26 V 28 V 30 V 32 V 34 V 36 V 38...

Страница 17: ...mmen mit den Vorschriften folgender europäischer Richtlinien überein The indicated products are in correspondence with the following regulations of European Council Nummer Kurztitel Number Titel Eingehaltene Vorschriften Observed regulations 2014 30 EU EMV Richtlinie EMC Directive EN 61000 6 2 2005 EN 61000 6 3 2007 EN 61000 3 2 2006 A1 2009 A2 2009 EN 61000 3 3 2008 2014 35 EU Niederspannungsrich...

Страница 18: ...al 12 TR Turkey 13 LT Lithuania 14 LV Latvia 15 BG Bulgaria 16 CY Cyprus 17 SE Sweden 18 CH Switzerland 19 PL Poland 20 CZ Czech Republic 21 SK Slowakia 22 FI Finnland 23 AL Albany 24 IE Ireland 25 SI Slovenia 26 MT Malta 27 HR Croatia 28 RO Romania 29 XZ Kosovo 40 IL Israel 41 AU Australia 42 TN Tunisia 43 BB Barbados 44 CL Chile 45 ZA South Africa 46 IR Iran 47 CN China 48 KZ Kazakhstan 49 IN In...

Страница 19: ...19 11 2019 INV315 50EU AEconversion GmbH Co KG An der Helle 26 59505 Bad Sassendorf Germany Telefon 49 0 2927 9194 10 Telefax 49 0 2927 9194 50 www aeconversion de ...

Отзывы: