background image

12

SE400 SERIES

Installation Guidelines

The following guidelines are provided to optimize the device performance. Review the guide-
lines before installing the device.

Make sure cabling is away from sources of electrical noise. Radios, power lines, and flu-
orescent lighting fixtures can interference with the device performance.

Make sure the cabling is positioned away from equipment that can damage the cables.

Operating environment is within the ranges listed range, see “Specifications” on page 1.

Relative humidity around the switch does not exceed 95 percent (noncondensing).

Altitude at the installation site is not higher than 10,000 feet.

In 10/100 fixed port devices, the cable length from the switch to connected devices can 
not exceed 100 meters (328 feet).

Make sure airflow around the switch and respective vents is unrestricted. Without proper 
airflow the switch can overheat. To prevent performance degradation and damage to the 
switch, make sure there is clearance at the top and bottom and around the exhaust 
vents. 

These instructions will explain how to find a proper location for your Modbus Gateways, how
to connect to the network, hook up the power cable, and connect to the SE400 Series.

Verifying Switch Operation

Before installing the device in a rack or on a wall, power on the switch to verify that the switch
passes the power-on self-test (POST). To connect the cabling to the power source see “Power
Supply Installation” on page 20. 

At startup (POST), the System LED blinks green, while the remaining LEDs are a solid green.
Once the switch passes POST self-test, the System LED turns green. The other LEDs turn off
and return to their operating status. If the switch fails POST, the System LED switches to an
amber state.

After a successful self-test, power down the switch and disconnect the power cabling. 

The switch is now ready for installation on its final location.

SWITCH INSTALLATION

Connecting Hardware

Содержание B+B SmartWorx SE416

Страница 1: ...ess mainly focus on the distribution of electronic components Line cards we deal with include Microchip ALPS ROHM Xilinx Pulse ON Everlight and Freescale Main products comprise IC Modules Potentiometer IC Socket Relay Connector Our parts cover such applications as commercial industrial and automotives areas We are looking forward to setting up business relationship with you and hope to provide you...

Страница 2: ...SE400 Series USER MANUAL ...

Страница 3: ...ttawa IL 61350 USA Phone 815 433 5100 Fax 815 433 5105 Advantech B B SmartWorx European Headquarters Westlink Commercial Park Oranmore Co Galway Ireland Phone 353 91 792444 Fax 353 91 792445 www advantech bb com support advantech bb com Document SE400 Series_R0_xx15m ...

Страница 4: ...net Cable Wiring 20 Power Supply Installation 20 Overview 20 Considerations 21 Grounding the Device 22 Wiring a Relay Contact 23 Wiring the Power Inputs 23 Managing Switch 26 First Time set up 26 Overview 26 SCADA Requirements 26 Administrative Interface Access 26 Using the Graphical Web Interface 27 Configuring the Switch for Network Access 27 Configuring the Ethernet Ports 27 Web Browser Configu...

Страница 5: ...te 62 Loopback Detection 63 MAC Address Table 65 Static MAC 65 MAC Aging Time 66 Dynamic Forwarding Table 66 Security 67 Storm Control 67 Port Security 69 Protected Ports 69 DoS Prevention 70 Applications 72 802 1x 73 QoS 75 General 75 QoS Basic Mode 81 Rate Limit 82 Management 84 LLDP 84 SNMP 87 Diagnostics 91 Cable Diagnostics 91 Ping Test 92 IPv6 Ping Test 93 System Log 94 DDM 97 Tools 98 IXM 9...

Страница 6: ...v SE400 SERIES Troubleshooting 103 Advantech B B Smartworx Technical support 103 ...

Страница 7: ...nstalling DC Wires in a Terminal Block 24 Figure 30 Securing a Terminal Block to a Receptor 25 Figure 31 Login Screen 29 Figure 32 Changing a Default Password 30 Figure 33 Monitoring Device Information 31 Figure 34 Monitoring Logging Message 32 Figure 35 Monitoring Port Monitoring Port Statistics 33 Figure 36 Monitoring Port Monitoring Port Utilization 33 Figure 37 Monitoring LLDP Statistics 34 Fi...

Страница 8: ...ity Storm Control Global Settings 67 Figure 81 Security Storm Control Port Settings 68 Figure 82 Security Port Security 69 Figure 83 Security Protected Ports 69 Figure 84 Security DoS Prevention DoS Global Settings 70 Figure 85 Security DoS Prevention DoS Port Settings 72 Figure 86 Security Applications HTTP 72 Figure 87 Security 802 1x 802 1x Settings 73 Figure 88 Security 802 1x 802 1x Port Conf...

Страница 9: ...g Server 96 Figure 115 Diagnostics DDM 97 Figure 116 Diagnostics DDM Diagnostic Alarm Information 97 Figure 117 Tools IXM 98 Figure 118 Tools Backup Manager 99 Figure 119 Tools Upgrade Manager 100 Figure 120 Tools Dual Image 101 Figure 121 Tools User Account 102 ...

Страница 10: ...witching Link Aggregation LACP Priority Settings 45 Table 34 L2 Switching Link Aggregation LACP Port Settings 45 Table 35 L2 Switching 802 1Q VLAN VLAN Management 46 Table 36 L2 Switching 802 1Q VLAN PVID Settings 47 Table 37 L2 Switching 802 1Q VLAN Port to VLAN 48 Table 38 L2 Switching GARP GARP Settings 49 Table 39 L2 Switching GARP GVRP Settings 50 Table 40 L2 Switching 802 3az EEE 50 Table 41...

Страница 11: ...Mode Global Settings 81 Table 78 QoS QoS Basic Mode Port Settings 81 Table 79 QoS Rate Limit Ingress Bandwidth Control 82 Table 80 QoS Rate Limit Egress Bandwidth Control 83 Table 81 QoS Rate Limit Egress Queue 83 Table 82 Management LLDP LLDP System Settings 84 Table 83 Management LLDP LLDP Port Settings LLDP Port Configuration 85 Table 84 Management LLDP LLDP Port Settings Optional TLVs Selectio...

Страница 12: ...l be required to correct the interference at his own expense Safety Instructions Read these safety instructions carefully Keep this user manual for later reference Disconnect this equipment from any AC outlet before cleaning Use damp cloth Do not use liquid or spray detergents for cleaning For plug in equipment the power outlet socket must be located near the equipment and must be easily accessibl...

Страница 13: ...d on a depreciated value Products of other manufacturers sold by Advantech B B SmartWorx are not subject to any warranty or indemnity offered by Advantech B B SmartWorx but may be subject to the war ranties of the other manufacturers Notwithstanding the foregoing under no circumstances shall Advantech B B SmartWorx have any warranty obligations or any other liability for i any defects resulting fr...

Страница 14: ... of up to 20 Soft ware is not returnable if opened Advantech B B SmartWorx will not accept returns of prod ucts that were modified by a customer All custom orders are non returnable and non cancelable REPAIR SERVICE We offer a repair service for our products Please call FAX or e mail to request a Return Material Authorization RMA number and routing instructions Shipping charges and any duties taxe...

Страница 15: ...T X SE416 series 16 x 10 100BaseT X SEC410 series 8 x 10 100BaseT X 2 x 10 100Base T X or 100Base FX SFP SEC418 series 16 x 10 100BaseT X 2 x 10 100Base T X or 100Base FX SFP Power Connector 6 pin screw Terminal Block including relay Physical Enclosure Metal Shell Protection Class IP30 Installation DIN Rail and Wall Mount Dimensions W x H x D SE408 series 43mm x 120mm x 84mm 1 69in x 4 72in x 3 3i...

Страница 16: ... 5 2 watts SE416 series 8 watts SEC410 series 5 8 watts SEC418 series 8 2 watts Power Input 12V 48V 8 4V 52 8V redundant dual inputs Certifications Safety IEC EN 60950 1 UL508 Class 1 Division 2 IECEx ATEX EMC CE FCC EMI EN 55011 55022 Class A EN 61000 6 4 FCC Part 15 Subpart B Class A EMS EN 55024 EN 61000 6 2 EN 61000 4 2 ESD Level 3 EN 61000 4 3 RS Level 3 EN 61000 4 4 EFT Level 3 EN 61000 4 5 ...

Страница 17: ...ont View No Item Description 1 System LED panel See System LED Panel on page 7 for further details 2 ETH port Eight 10 100BaseT X ports 3 LNK ACT LED Link activity LED 4 Speed LED Gigabit Ethernet Green 1000M Amber 100M Off 10M Fast Ethernet Amber 100M Off 10M 8 7 6 5 3 4 1 2 P2 P1 P Fail Loop 10 100 SE408 1 2 3 4 ...

Страница 18: ...No Item Description 1 System LED panel See System LED Panel on page 7 for further details 2 ETH port Sixteen 10 100BaseT X ports 3 LNK ACT LED Link activity LED 4 Speed LED Fast Ethernet Amber 100M Off 10M P2 P1 P Fail Loop 8 10 100 10 100 SE416 7 6 5 3 4 1 2 16 15 14 13 11 12 9 10 LNK SPD 1 2 3 4 ...

Страница 19: ...further details 2 ETH port Eight 10 100BaseT X ports two 100 1000BaseT X combo ports 3 LNK ACT LED Link activity LED 4 Speed LED Gigabit Ethernet Green 1000M Amber 100M Off 10M 5 ETH port Two 10 100 1000BaseT X ports 6 ETH port Two 100 1000Base FX SFP ports 8 7 6 5 3 4 1 2 10 9 9 10 LNK ACT P2 P1 P F Loop 10 100 10 100 1000 10 100 1000 SEC410 2SFP LNK SPD 1 2 6 3 4 5 5 6 ...

Страница 20: ...r further details 2 ETH port Sixteen 10 100BaseT X ports two 100 1000BaseT X combo ports 3 LNK ACT LED Link activity LED 4 Speed LED Gigabit Ethernet Green 1000M Amber 100M Off 10M 5 ETH port Two 10 100 1000BaseT X ports 6 ETH port Two 100 1000Base FX SFP ports 8 7 6 5 3 4 1 2 16 15 14 13 11 12 18 17 9 10 P2 P1 P F Loop 10 100 1000 10 100 10 100 SEC418 2SFP 1 2 5 3 4 6 ...

Страница 21: ...d green Powered up Off Powered down or not installed 2 PW2 LED Solid green Powered up Off Powered down or not installed 3 P Fail Solid red When PW1 or PW2 is disconnected the LED lights Off When PW1 and PW2 is connected the LED is off 4 Loop Solid red When loop detected the LED lights Off No loop detected P2 P1 P Fail Loop 1 2 3 4 ...

Страница 22: ... SERIES The following view applies to SE408 series Figure 6 Rear View Rear View Table 9 Rear View No Item Description 1 DIN Rail mounting plate Mounting plate used for the installation to a standard DIN rail 1 ...

Страница 23: ...to SE408 series Figure 8 Top View Table 10 Rear View No Item Description 1 DIN Rail mounting plate Mounting plate used for the installation to a standard DIN rail Top View Table 11 Top View No Item Description 1 Terminal block Connect cabling for power and alarm wiring 1 P Fail V2 PWR2 DC 12 48V 1A 24V PWR1 V2 V1 V1 1 ...

Страница 24: ...view applies to SE408 series Figure 10 Bottom View Table 12 Top View No Item Description 1 Terminal block Connect cabling for power and alarm wiring Bottom View Table 13 Bottom View No Item Description 1 Ground terminal Screw terminal used to ground chassis P Fail V2 PWR2 DC 12 48V 1A 24V PWR1 V2 V1 V1 1 1 ...

Страница 25: ...11 SE400 SERIES The following view applies to SE416 SEC410 SEC418 series Figure 11 Bottom View Table 14 Bottom View No Item Description 1 Ground terminal Screw terminal used to ground chassis 1 ...

Страница 26: ... the switch can overheat To prevent performance degradation and damage to the switch make sure there is clearance at the top and bottom and around the exhaust vents These instructions will explain how to find a proper location for your Modbus Gateways how to connect to the network hook up the power cable and connect to the SE400 Series Verifying Switch Operation Before installing the device in a r...

Отзывы: