3.8
Preventative Maintenance
The following maintenance items should be performed by the operator or maintenance personnel to
prolong the life of the equipment. Failure to perform these tasks may result in premature wear, personal
injury or equipment damage.
Item:
Description:
Frequency:
Anti-jam
Test anti-jam prior to production
Daily
Pressure
Check air pressure to ensure 60-70 PSI
Daily
Teflon
Inspect for wear / holes, turn 1/4” if required
Daily
Rollers
Clean with Isopropyl Alcohol
Daily
Rubber Strip
Clean rubber strip with Isopropyl Alcohol
Weekly
Cylinders
Remove air and push in manually to ensure free movement with no
binding.
Weekly
Pressure Bar
Remove air and push in manually to ensure free movement with no
binding
Weekly
Springs
Inspect for cracks in springs, ensure free movement
Monthly
Wiring
Ensure no loose contacts or worn shielding
Monthly
Fasteners
Tighten mounting bolts and fasteners
Monthly
Blower filter
Clean/replace if air flow decreases
Monthly
Electronics
Remove covers and blow out compartments
Monthly
21
Содержание T-200
Страница 10: ...This page intentionally left blank 9 ...
Страница 15: ...T 200 Threading Diagram Figure 2 1 14 ...
Страница 16: ...This page intentionally left blank 15 ...
Страница 27: ...T 200 Electronics Assembly PN TA T8 1000 26 ...
Страница 29: ...T 200 Heater Bar Assembly PN TA T8 2000 28 ...
Страница 32: ...T 200 Main Frame Assembly PN TA T8 4000 31 ...
Страница 34: ...F T 200 Pneumatic Layout Dwg NO T 200 PNE 33 ...
Страница 35: ...G T 200 Electrical Layout 34 ...