background image

Suction case with motorized nozzle

8

18/07/22 Rev:1.0.5

5.1 Characteristics of the storage tank

The application of the suction case must be made at the lowest point of the hopper part of the tank. 
Tanks can be constructed in any form, size, and material.
The hopper walls must be all connected at the point where the case is installed, so the warehouse will 
be able to be completely empty.
Please remember that for a good sliding of solid fuels, the hopper walls of the tank must have a tilt of 
about 45°.
It is always necessary to place a shutter between the tank and the suction case which, when closed, 
separates the fuel in the tank from the suction case in order to facilitate inspections, maintenance and 
repairs on internal movements.
The suction case can also be installed in small collection tanks that receive fuel from large tanks 
already equipped with automatic emptying screw conveyors: in this case the suction case can work in 
conjunction with them.

6 INSTALLATION

It is the installer’s responsibility to verify the presence of any risk of danger in the installation 
area and to determine the suitability in accordance with both the applicable laws and the product 
characteristics described in this manual.

The installer must also comply with the requirements of this manual as well as inform the user of the 
operation and maintenance of the installed products and report any dangers related to their use.
It is necessary to leave a free space of adequate size all around the product, in order to permit any 
repair, maintenance or inspection operation.
The product should not be exposed to atmospheric agents and should not be installed in areas subject 
to high humidity, possible fl ooding, high temperatures and dust presence.

6.1 Instructions for the installation of systems

Consider that in pneumatic fuel transport systems there are two different types of pipe features:
A sections of pipes where only air and eventually dust pass through
B- sections of pipes where both air and fuel pass through
Mandatory all sections of piping through which the fuel passes must be made with PU or steel pipe and they 
must be connected to be antistatic.
We remind you that the lengths of the various pipe sections described in our manuals and catalogs are purely 
indicative: when we speak of “available length” we mean the total development of the various sections.
It is always advisable to make mainly straight and horizontal piping sections and, in any case, with the least 
number of changes of direction and vertical paths.
For all the sections where fuel passes, it is recommended to follow these simple rules:
the maximum length allowed for the various sections of piping depends on the components chosen for your 
system: 
1- the maximum permissible length of the various pipe sections is always bound by the components chosen 
for your system, the characteristics and technical data provided for each component must always be evalua-
ted in advance so that the system works at its best and has the required characteristics.
2- in two-pipe systems (fuel suction and air return to the silo) the limits on the lengths are generally much 
lower and never exceed 10 meters. With some products pipe lenght cannot be more than 3 meters.
3- in single-pipe systems, the maximum length allowed for the various sections of pipe, despite being limited 

Содержание VACU MATIC FREE

Страница 1: ...12 ASSEMBLY USE AND MAINTENANCE MANUAL Fuel extraction system VACU MATIC FREE...

Страница 2: ......

Страница 3: ...fety symbols 6 4 PACKAGING CONTENT 7 5 PROPER USE OF THE PRODUCT 7 5 1 Caratteristiche del magazzino di stoccaggio 8 6 INSTALLATION 8 6 1 Instruction for the installation of systems 8 6 2 Positioning...

Страница 4: ...h care for the entire operative life of the product The main objective of this manual is to make known the proper and safe way to use the equipment No part of this manual may be reproduced copied or s...

Страница 5: ...ower W 15 Max absorp on A 0 14 Fuse 5x20 T2A Insula on class 1 Revolu ons per minute rpm 12 Rated torque Nm 5 Weight Kg 3 1 Measurement A mm 185 Measurement B mm 108 Measurement C mm 235 Measurement D...

Страница 6: ...NT Danger of serious personal injuries During maintenance operations always disconnect the power supply and make sure that it cannot be restored DANGER OF CUTTING Danger of serious personal injuries D...

Страница 7: ...er 40 mm or diameter greater than 15 mm It is recommended to use only ENplus A1 certified pellet To provide the job for which it was designed the suction case must be connected to a control panel call...

Страница 8: ...e product should not be exposed to atmospheric agents and should not be installed in areas subject to high humidity possible flooding high temperatures and dust presence 6 1 Instructions for the insta...

Страница 9: ...adius of the curves must be equal to or greater than 0 5 meters 6 sections of pipes that include both positive and negative siphons must be avoided 7 the sections of horizontal pipes must be kept perf...

Страница 10: ...so that it is not such as to cause blockages in the system To procede with this adjustment close or open the ventilation cuts by forward or backward the regulation sleeve see fig 2 By closing the cut...

Страница 11: ...power outlet In the event of a protection circuit breaker intervention during the operation of the suction case the polarity of the plug must be inverted invert phase with neutral F0030683 ALARM MICRO...

Страница 12: ...trical system to which it is connected the rod crank system operates regularly there are no foreign bodies in the storage tank For the first time just place a small amount of fuel in the storage tank...

Страница 13: ...each filling of the storage tank or at least yearly The checks to be carried out at least yearly are Check the antistatic pipe grounding conditions and the electrical system conditions Check the elec...

Страница 14: ...en In the 4 weeks after the fuel filling enter only with a CO detector Aerate the storage room for at least 15 minutes before entering and keep the door open during your permanence Ensure an adequate...

Страница 15: ...rom 1 accident abuse misapplication repair alteration or unauthorized disassembly 2 maintenance operation use which is not in accordance with the product instructions or connection to an improper volt...

Страница 16: ...Regulation EC 1907 2006 REACH or registration evaluation authorization and restriction of chemical substances Although in the working cycles of raw materials and our products such substances are not...

Страница 17: ...17 English 18 07 22 Rev 1 0 5...

Страница 18: ...Suction case with motorized nozzle 18 18 07 22 Rev 1 0 5...

Страница 19: ......

Страница 20: ...VACU MATIC FREE F0920525 2 info advanceeasymoving com www advanceeasymoving com...

Отзывы: