61202060L2-1
TSU LT User Manual
8-1
Chapter 8
Example Operations
TESTING EXAMPLES
Before using the TSU LT to pass data, it is recommended to
run tests on the circuit. Testing consists of sending a test
pattern from end-to-end and checking for errors in the
pattern. There are two types of tests used to accomplish this:
•
Send the pattern from one end and loop back the far end.
•
Send the pattern from both ends and check at both ends.
Far End Looped Back Test
Two types of tests can be executed with the far end looped.
The first is a check of the network and the network interfaces
at both ends (511). The second is a check of the DTE port.
Network Interface Test
The Network Interface Test can be run with any channel
setup because the 511 pattern is always sent in the occupied
channels.
Step
Action
1
Select
TEST
from the
MAIN
MENU
. See Figure 8-1.
2
Use the
Up
and
Down arrows
to place the cursor
on
TEST
.
3
Press
Enter
to select
Result
: The first two
TEST
submenu items display.
See Figure 8-2
.
Содержание 1202060L2-1
Страница 1: ...TSU LT User Manual Part Number 1202060L2 1 Document Number 1202060L2 1 February 1999...
Страница 16: ...List of Tables xvi TSU LT User Manual 61202060L2 1...
Страница 28: ...Chapter 1 Introduction 1 12 TSU LT User Manual 1202060L2 1...
Страница 44: ...Chapter 4 Status Menu 4 6 TSU LT User Manual 61202060L2 1...
Страница 56: ...Chapter 5 Configuration Menu 5 12 TSU LT User Manual 61202060L2 1...
Страница 60: ...Chapter 6 Utility Menu 6 4 TSU LT User Manual 61202060L2 1...
Страница 72: ...Chapter 8 Example Operations 8 6 TSU LT User Manual 61202060L2 1...
Страница 76: ...Appendix B DTE Data Rate Chart B 2 TSU LT User Manual 61202060L2 1...
Страница 86: ......