![Adp 40000 Series Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/adp/40000-series/40000-series_installation-manual_2853413008.webp)
Preparing an Installed Series 4000 Timeclock for Battery Installation
4
ADP, Inc.
5. Remove the transformer from the timeclock. To do this:
a.
Trace the cable back to the transformer, freeing the cable from the routing channel
in the timeclock.
b. Carefully lift the transformer up and out from behind the wire transformer clip, and
out of the timeclock.
6. Remove the wire transformer clip (see the following illustration) from the base so that
you have room to install the backup battery. Do this by squeezing both sides of the clip
until you can lift it from the base.
Содержание 40000 Series
Страница 4: ......
Страница 18: ...What To Do Next 14 ADP Inc ...