ADELSYSTEM ALL IN ONE CBI Series Скачать руководство пользователя страница 4

 

 

   

     

    

 Pa

ge

 4

 -

 Ch

ap

te

r:

 

 

   

5.5  OUTPUT LOAD: TIME BUFFERING MODE (MAINS INPUT OFF) 

Some example of buffering time depending on LOAD Output in function to the Ah of the battery. 

Buffering Time 

BATT1.2 Ah 

BATT 3 Ah 

BATT7.2 Ah 

BATT12 Ah 

BATT100 Ah 

Load 1.5 A 

20 min 

60 min 

200 min 

400 min 

Load 3 A 

8 min 

30 min 

120 min 

240 min 

Load 5 A 

3 min 

15 min 

55 min 

100 min 

Load 7.5 A 

2 min 

10 min 

30 min 

60 min 

Load 10 A 

No 

7 min 

20 min 

45 min 

20 h 

Load 12 A 

No 

3 min 

12 min 

30 min 

600 min 

Load 15 A 

No 

No 

9 min 

20 min 

400 min 

Load 20 A 

No 

No 

7 min 

13 min 

240 min 

 

6  LAY-OUT AND CONNECTIONS 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

7  INPUT AND OUTPUT LOAD AND BATTERY CONNECTION 

7.1.1  Input AC Port L – N: 

No.10 
1 Phase Switching Power Supplies L, N, PE  . 
Size 2 and Size 3 BRIDGE ONLY for input 115 Vac, and connect L, N, PE  . 

 

7.1.2  Battery Connection Port: 

No.1: Connect the battery between: pin. 3 (–) and 4 (+) 
One battery (12 Vdc) for CBI12xx;  
Two battery (12 Vdc) connected in Series for CBI24xx;  
Four battery (12 Vdc) connected in Series for CBI48xx;  

7.1.3  Output Load: 

No.2:Connect this Output to the load, pin: 1 (–). 2 (+). 

Содержание ALL IN ONE CBI Series

Страница 1: ...y efficiency reduces risk of battery damage and allows a safe operation in permanent connection Predefined curves can be selected by jumpers or DIP switch to optimize the charge of different battery t...

Страница 2: ...or Load DC Bus one Input Output for connection to the battery N 1 battery 12 Vdc for CBI 12xx N 2 battery 12 Vdc connected in Series for CBI 24xx N 4 battery 12 Vdc connected in Series for CBI 48xx 5...

Страница 3: ...installation clearance of 10 mm left right between two power supplies and avoid installing the power supplies on top of each other Note Avoid return voltage e g from a decelerating motor or battery w...

Страница 4: ...45 min 20 h Load 12 A No 3 min 12 min 30 min 600 min Load 15 A No No 9 min 20 min 400 min Load 20 A No No 7 min 13 min 240 min 6 LAY OUT AND CONNECTIONS 7 INPUT AND OUTPUT LOAD AND BATTERY CONNECTION...

Страница 5: ...wer 2 See Diagnosis Led 8 1 4 Relay Contact Rating Max DC1 30 Vdc 1 A AC1 60 Vac 1A Resistive load EN 60947 4 1 Min 1mA at 5 Vdc Min permissive load 8 1 5 Charging Mode STATUS Status Led Diagnosis No...

Страница 6: ...Acid Gel Ni Cd option They guarantee battery reliability in time by continuously testing the internal impedance status avoids any possible risk of damages and grants a permanent reliable and safe conn...

Страница 7: ...er Position Size 1 Jumper Position Size 2 Jumper Position Size 3 Dip Switch Position Size 4 Float charge Volt Cell Fast charge Volt Cell Open Lead 2 23 2 40 AGM Low 2 25 2 40 Gel Battery 2 30 2 40 NiC...

Страница 8: ...he quality resistance on the battery connection is checked every 60 sec This to detect if the cable connection has been properly made Battery in Open Circuit or Sulphated In Float charging mode the Al...

Страница 9: ...STICS The unit is a SLAVE in a MODBUS network The slave units are compliant to the following specifications Transmission mode MODBUS RTU Electrical Interface RS485 half duplex serial line Baud rate 48...

Страница 10: ...onnection Diagram Size3 CBI500 DPYCONN500 is a special cable for the connection of CBI Size3 and the other device max leght 0 5m RJ45COUPLER is e T connection RJ45 for daisy Chain with CBI Size3 RJCON...

Страница 11: ...ections to the external device like RTU PC DPY351 For the connection to RTU PLC or similar devices refer to the instruction manuals Modbus specifications_R14 Web Site www adelsystem com For configurat...

Страница 12: ...ity to EN60950 UL60950 1 and CSA C22 2 No 60950 1 07 Information Technology Equipment Safety Part1 General Requirement Device is intended to be installed in a cabinet protected from external shocks or...

Отзывы: