RC/FC Series Unit Start-Up Form
COOLING CHECK
Compressor Circuit #1:
Suction Pressure:
Discharge Pressure:
Liquid Pressure:
Superheat:
Subcooling:
Compressor 1 AMPS:
Compressor 2 AMPS:
Suction Temp:
Discharge Temp:
Liquid Temp:
To Calculate Superheat: Convert suction pressure to saturation temperature,
then subtract the suction line temperature.
L1
L1
L2
L2
L3
L3
RLA
RLA
Saturation Temp:
Saturation Temp:
To Calculate Subcooling: Convert liquid line pressure to condensing tempera-
ture, then subtract the liquid line temperature.
Compressor Circuit #2:
Suction Pressure:
Discharge Pressure:
Liquid Pressure:
Superheat:
Subcooling:
Compressor 1 AMPS:
Compressor 2 AMPS:
Suction Temp:
Discharge Temp:
Liquid Temp:
To Calculate Superheat: Convert suction pressure to saturation temperature,
then subtract the suction line temperature.
L1
L1
L2
L2
L3
L3
RLA
RLA
Saturation Temp:
Saturation Temp:
To Calculate Subcooling: Convert liquid line pressure to condensing tempera-
ture, then subtract the liquid line temperature.
Condenser Fans:
Condenser Fan 1 AMPS:
Condenser Fan 2 AMPS:
Condenser Fan 3 AMPS:
Condenser Fan 4 AMPS:
Condenser Fan 5 AMPS:
Condenser Fan 6 AMPS:
L1
L1
L2
L2
L3
L3
L1
L1
L2
L2
L3
L3
L1
L1
L2
L2
L3
L3
Hot Gas Bypass/Hot Gas Reheat:
Hot Gas Bypass # of Stages:
Hot Gas Reheat # of Stages:
Setpoint:
Setpoint:
1:
1:
2:
2:
3:
4:
Unloading Switch:
Cut In:
Cut Out: