Page 28 of 80
Slope Down From Air Handler
Condensate Trap And Pipe
Suction
Liquid
Slope Down Towards Condensing Unit 1” - 10’
Note: Add Additional Trap
for Each 20ft of Riser
Figure 7: Lineset Piping with the Air Handler Below the Condensing Unit
RC/FC Series Installation, Operation, and Maintenance Manual