ACV International
50
9.1.3
Assembly
When fitting the various seals check for damage, hardening, tears or
hairline tears and/or discoloration. Where necessary fit a new seal.
Also check whether seals ar still correctly positioned.
Failure to fit the sensors S1 and/or S2, or the stem strips, or to fit
them correctly, can result in serious damage.
1.
Fit the stem strips in the heat exchanger..
2.
Check that the seal around the front cover is correctly installed. Place the front
cover on the heat exchanger and secure it using the socket head screws plus
serrated lock washers. Tighten the socket head screws equally hand-tight,
working crosswise.
3.
Fit the gas connecion below the gas block.
4.
Fit the connector to the fan and the ignition unit to the gas block.
5.
Fit the condensate drain by sliding t on to the exchanger outlet stump (1) with the
siphon connection still inf ont of the base tray. Then turn it to the left (2) and push
it downwards into the siphon connection (3). Make sure in doing this that the back
of the ondensate drain pan comes to rest on the lug at the back of the base tray
(A).
6.
Fill the siphon with water and fit it to the connection below the condensate drain
pan.
7.
Slide the flue pipe, turning it anti-clockwise, with the top around the flue adapter,
into the top cover. Insert the bottom into the condensate drain pan and tighten the
coupling nut clockwise..
8.
Open the gas tap and check the gas connections below the gas block and on the
mounting bracket for leakage.
9.
Check the CH and the water pipes for leakage..
10.
Insert the plug into the wall socket..
11.
Switch the appliance on with the
key.
12.
Check the font cover, the fan connection on the front cover and the flue pipe
components for leakage.
13.
Check the gas/air adjustment. (See section 7.10) Fit the casing, tighten the two
screws left and right of the display and close the display cover.
14.
Check the geating and the got water supply