background image

EN • 4

ENGLISH

FRANCAIS

NEDERLANDS

ESP

AÑOL

IT

ALIANO

DEUTSCH

664Y2900.C

ELECTRICAL CONNECTION

HeatMaster

®

 201:

serial number > at 1000

Flow sensor (14)

-  Mount the NTC6 sensor on the flow tube.
-  Connect the sensor to the 15 and 16 terminals.

Heating pump (16)

Connect the heating pump on the terminal block:
line voltage to 07, neutral to 08 and ground to 09.

Motor of the 4-ways valve (20)

-  Connect the ground to 19.
-  Connect the brown wire to 20 (closing contact)
-  Connect the blue wire to 21 (neutral)
-  Connect the black wire to 22 (Opening contact)

Booster shunt pump (19)

-  Connect the line connection of the Booster shunt pump to 

16, the neutral to 17 and the ground to 18.

t

BUS B

BUS A

O Volt

X3

01

02

03

04

06

05

07

08

09

10

11

12

13

14

15

16

17

18

19

P

14

12

11

10

9

8

7

10

11

13

14

07

08

05

04

03

02

01

06

09

12

15

21

20

22

19

23

24

28

27

26

25

X2

M

M1

M

M2

M

M3

M

M4

M6

M

N

 16

17

18

M

M5

15

16

17

18

19

20

21

22

23

R

Bl

Y/Gr

R

Bl

Y/Gr

R

Bl

Y/Gr

R

Bl

Y/Gr

R

Bl

Y/Gr

Y/Gr

Содержание HeatMaster 200N Booster

Страница 1: ...EN 1 ENGLISH FRANCAIS NEDERLANDS ESPA OL ITALIANO DEUTSCH 664Y2900 C Assembling and installation instructions HeatMaster 201 Booster HeatMaster 200N Gas Booster HeatMaster...

Страница 2: ...your approved installer The parts may only be replaced by genuine factory parts You will find a list of the spare parts and their ACV reference number at the end of this document WARNINGS This docume...

Страница 3: ...he 4 ways valve Pack 6 Booster kit including the Booster bracket and holder tubes and hydraulic components for the heating and shunt loops Pack 7 Gas burner with insulation and gasket only HeatMaster...

Страница 4: ...nnect the ground to 19 Connect the brown wire to 20 closing contact Connect the blue wire to 21 neutral Connect the black wire to 22 Opening contact Booster shunt pump 19 Connect the line connection o...

Страница 5: ...20 Connect the ground to 16 Connect the brown wire to 17 closing contact Connect the blue wire to 18 neutral Connect the black wire to 19 Opening contact Booster shunt pump 19 Connect the line connect...

Страница 6: ...common of the relay 18 Connect the neutral of the Booster shunt pump 19 to terminal 10 Connect the hot line of the Booster shunt pump 19 to the normally closed terminal of the relay 18 1 2 3 4 5 6 7...

Страница 7: ...parts from the rear panel 7 Fix the Booster holder on the mounting legs with four M10 bolts 4 Put the rear panel in place 5 Mount the two M M union connections on the flow and the return of the boile...

Страница 8: ...justment 10 Mount a 90 elbow on the lower nipple of the Booster 11 On this elbow mount the 2 tube with the two right hand threads Pay attention to the threads one tube has a left hand thread 12 On thi...

Страница 9: ...nion connexion 19 Connect the shunt pump with its upper and lower tube between the HeatMaster and the Booster 20 Mount the 6 studs on the flange and put the gasket in place 21 Locate the flue collecto...

Страница 10: ...H 664Y2900 C BOOSTER KIT ASSEMBLY 24 Hydraulic connexion of the heating system 25 Electric connexion of the shunt pump M5 see pages 4 5 and 6 26 Commissioning of the system and control of the complete...

Отзывы: