MAINTENANCE

COMMISSIONING

1

2

3

4

5

2

6

7

8

9

10

11

I

O

4.

Open the automatic air vent located on top of the boiler.

Important: You must not excessively tighten the threaded plug to
allow automatic bleeding.

5.

After venting the air from the system, bring the pressure up to the
static head plus 0.5 bar: 1.5 bar = 10m and 2 bar = 15 m.

6.

Check the electrical connection and the ventilation in the boiler
room.

7.

Move the main switch to “ON”.

8.

Set the thermostat to the desired temperature.

9.

When the burner is on, check that the flue-gas discharge pipes
are completely gas tight.

10. After operating for five minutes, turn off the boiler and drain the

heating circuit again, maintaining a pressure of 1 bar.

11. Turn the appliance back on and check the combustion 

(see table

page 5).

A

B

SERVICE INTERVALS

ACV recommends that boilers should be serviced at least once a year.
The burner must be serviced and tested by a competent engineer.
In the event of heavy use of the boiler, it may require servicing on a
more regular basis than once a year. In this case, contact ACV for
advice.

SERVICING THE BOILER

1.

Set the main switch on the control panel to OFF and cut the
outside power supply.

2.

Close the valve supplying gas to the boiler.

Vertical flue-gas outlet reducer
3.

Take down and remove the flue lining to release the top of the
boiler.

4.

Loosen the nuts and remove the chimney reducer.

5.

Take out the turbulators from the flue ways to clean them.

6.

Dismantle the chamber plate and remove the burner.

7.

Brush the flue ways.

8.

Clean the combustion chamber and the burner.

9.

Replace the turbulators, the chimney reducer, and the flue lining;
check that the seal on the chimney reducer is in good condition.
Replace the seal if necessary.

Horizontal flue-gas outlet reducer
3.

Loosen the nuts and remove the chimney reducer.

5.

Take out the turbulators from the flue ways to clean them.

6.

Dismantle the chamber plate and remove the boiler.

7.

Brush the flue ways.

8.

Clean the combustion chamber and the burner.

9.

Replace the turbulators, the chimney reducer, and the flue lining;
check that the seal between the chimney reducer and the
chimney is in good condition. Replace the seal if necessary.

SERVICING THE SAFETY DEVICES

- Check that all thermostats and safety devices are working properly.
- Test the safety valves on the central heating and hot water circuits.

SERVICING THE BURNER

- Check that the insulation and the seal on the chamber plate are in

good condition; replace them if necessary.

- Check and clean the burner.
- Check that the safety devices are in good working order.
- Check the combustion 

(CO2, CO)

and record the values and any

other comments on page 15 of the service record.

FILLING THE HOT WATER AND HEATING CIRCUITS

IMPORTANT
Hot water tank must be pressurised before the
heating circuit is filled.

1.

Close the fill valves for the heating circuit (A and B).

2.

Open the stop valve (1) and draw-off tap (8).
Fill the tank with the water from the tap; close the draw-off
tap (8).

3.

Fill the primary heating circuit by opening the fill valves
(A and B), taking care not to exceed 1 bar of pressure.

Содержание HeatMaster 200 F

Страница 1: ... 641 Primary circuit capacity L 241 241 Hot water connection Ø 2 2 Heating connection Ø 2 2 Chimney connection Ø mm 250 250 Water tank heat transfer surface m2 5 30 5 30 Drained weight Kg 530 550 Pressure loss of the primary circuit mbar 240 240 Combustion efficiency 93 5 93 7 Output CO2 12 8 12 9 Net temperature of the flue gases C 143 140 5 Mass flow rate of combustion products g sec 65 2 83 0 N...

Страница 2: ...L 10 1570 1675 Peak delivery at 45 C L 10 1350 1444 Peak delivery at 60 C L 10 915 961 Peak delivery at 70 C L 10 737 755 Peak delivery at 80 C L 10 586 586 Peak delivery at 40 C L 60 4920 5976 Peak delivery at 45 C L 60 4221 5131 Peak delivery at 60 C L 60 2925 3126 Peak delivery at 70 C L 60 2412 2309 Peak delivery at 80 C L 60 1712 1712 Continuous delivery at 40 C L h 4020 5161 Continuous deliv...

Страница 3: ...pical boiler connection B23 The boiler is connected to the chimney by a metal pipe rising at an angle from the boiler to the chimney A flue disconnection piece is required This must be easy to remove to give access to the flue pipes when servicing the boiler Ventilation 200 N 200 F Min fresh air requirement m3 h 277 353 Bottom dm2 2 45 2 45 Top dm2 4 62 5 88 Chimney minimum flue diameter 200 N 200...

Страница 4: ...ies a temperature and pressure relief valve must be fitted consult your ACV stockist for assistance Example of hot water connection with thermostatic mixer 1 Stop cock 2 Non return valve 3 Pressure reducing valve 4 Expansion relief valve 5 Hot water expansion vessel 6 Hot water secondary pump it fitted 7 Thermostatic mixing valve 8 Drawoff tap 9 Drain cock 10 Stop cock for cleaning 11 Temperature ...

Страница 5: ...Isolating valves 5 Safety valve set to 3 bar with pressure gauge 6 Expansion vessel 7 Drain cock 8 Controller optional 9 Surface mounted sensor optional WARNING The pimary safety valve is supplied with a plastic tube connected to the discharge outlet this is for test purposes only and should be removed The safety valve should be connected to a drain using a metallic pipe eg copper BEWARE In the ca...

Страница 6: ...circuit low water pressure indicator 6 Low water pressure switch 7 Time clock 8 Summer winter switch 9 Hot water priority link 10 Burner lockout indicator 11 Room thermostat connection option 12 Central heating pump 13 HeatMaster shunt pump 14 Burner plug connector 15 Water flow switch connection option 16 Thermal reset high limit thermostat 95 C 17 Control thermostat Electrical connection HeatMas...

Страница 7: ... them 6 Dismantle the chamber plate and remove the burner 7 Brush the flue ways 8 Clean the combustion chamber and the burner 9 Replace the turbulators the chimney reducer and the flue lining check that the seal on the chimney reducer is in good condition Replace the seal if necessary Horizontal flue gas outlet reducer 3 Loosen the nuts and remove the chimney reducer 5 Take out the turbulators fro...

Страница 8: ... 4 Open valve 9 then valve 10 5 Let the water empty into the drain For the tank to be emptied valve 9 must be situated at ground level D A N G E R HOT 1 2 3 4 5 2 6 7 8 9 10 11 I O 1 4 2 3 6 5 8 I O 7 4 9 PLACING THE BURNER IN SAFETY MODE When the burner is in safety mode the safety indicator located on the burner and the control panel lights up The red warning light indicates an operating fault W...

Отзывы: