EN • 16
664Y4300.E
E
ngl
is
h
F
R
A
n
Ç
A
is
n
E
D
E
R
l
A
n
D
s
E
s
p
A
ñol
iT
A
l
iA
n
o
D
E
u
T
s
c
h
p
o
l
s
K
i
H
oil supply for acV BMV BurnErs
Supply construction and installation must be in accordance with current
regulations.
The oil pipe must be brought sufficiently close to the burner so that the hoses
can be connected without stretching. On the supply side of the line, fit a filter
with a quick closing valve.
For further information regarding the oil supply, please consult
the technical manual supplied with the burner.
If a different burner is installed, please refer to the
manufacturer’s technical manual.
Gas supply for acV BG 2000-s BurnErs
- The
Delta Pro & Pro Pack boilers combined with an ACV BG 2000-S burner
have a Ø 3/4” [F] gas connection for connection of a gas supply valve.
- The gas connections must comply with all applicable standards (in Belgium:
NBN D51-003).
- If there is a risk of dirt stemming from the gas network, place a gas filter
upstream of the connection.
- Purge the gas pipe and carefully check that there are no leaks on the boiler’s
internal and external pipes.
- Check the system’s gas pressure. Please refer to the technical data table.
- Check the gas pressure and consumption when commissioning the
appliance.
INstaLLatIoN
oil supply with return
height h
Ø 6 mm
Ø 8 mm
Ø 10 mm
0,0 m
17 m
53 m
100 m
0,5 m
15 m
47 m
100 m
1,0 m
13 m
41 m
199 m
1,5 m
11 m
34 m
184 m
2,0 m
19 m
28 m
168 m
2,5 m
17 m
22 m
153 m
3,0 m
15 m
15 m
137 m
3,5 m
13 m
19 m
122 m
Содержание Delta Pro 25
Страница 26: ...EN 26 664Y4300 E English FRAN AIS NEDERLANDS espa ol ITALIANO deutsch POLSKI...
Страница 34: ...ML 8 S p are Part s 664Y4300 E...
Страница 35: ...ML 9 S p are Part s 664Y4300 E...
Страница 36: ...ML 10 S p are Part s 664Y4300 E...