background image

EN • 7

BURNER SHUTDOWN

If the oil burner is not working:

1.  The burner indicator lamp lights.

2.  Press  the  burner  reset  button  on  the  burner.  Now  switch 

off the boiler for a few seconds at the main switch and then 

restart it.

If the gas burner is not working:

1.  Remove the protective burner cover.

2.  The reset button lamp is lit. 

3.  Press the reset button to start the burner. Now switch off the 

boiler for a few seconds at the main switch and then restart it.

If the oil or gas burner does not operate, isolate the boiler’s electrical supply at the switch 

on the external control box before removing the front panel of the casing, for press the 

manual reset high limit thermostat on the top of the boiler

Manual reset high

limit thermostat

  Wait until the boiler temperature drops to below 60°C, then refit the front panel

  of the casing.

 

 

If the problem persists, please contact your installer for advice.

Starting the burner.

In normal operation the burner starts automatically if the temperature of the boiler is below setpoint.

  To ensure that your system operates correctly, please have it serviced annually by a

  qualified engineer; servicing should be done before the start of the heating season.

INSTRUCTIONS

Содержание Delta F25

Страница 1: ...excellence in hot water delta performance performance 25 35 45 55 F25 F35 F45 F55 G25 G35 G45 G55 16 12 2004 664Y0001 EN INSTALLATION OPERATING AND SERVICING INSTRUCTIONS ...

Страница 2: ...m 9 Chimney connection 9 Heating system connection 10 Domestic hot water connection 10 Controller kits 11 Oil supply 11 ELECTRICAL CONNECTIONS 12 Electrical boiler connection 12 Electrical burners connection 12 OIL BURNER CHARACTERISTICS 13 Description 13 Setting oil burner parametres 13 GAS BURNER CHARACTERISTICS 14 ACV BG 2000 S Air Gas premix gas burner 14 Setting gas burner parametres 14 Gas c...

Страница 3: ...ol panel APPLICABLE STANDARDS The products described in this document have been certified at European level CE European Directives 92 42 EEC Efficiency 90 396 EEC Gas devices They have be awarded the Belgian label HR gas boilers and OPTIMAZ oil boilers IMPORTANTS NOTES These instructions are an integral part of the equipment to which they relate and must be handed to the user The product must be i...

Страница 4: ...le command the water temperature of both the primary circuit and the domestic hot water circuit can be set by the adjustable thermostat situated underneath the tank in the primary circuit A cut off thermostat placed on the top of the boiler automatically switches off the burner when the temperature of the water in the primary circuit reaches 95 C A manually resetable safety thermostat switches off...

Страница 5: ...stion chamber Boiler drain cock Inner annular tank containing a domestic hot water Polyurethane foam insulation Outer body containing the primary water Base Detachable front panel Burner cover Manual reset high limit thermostat 103 C Control panel Side casing Burner chamber plate Control thermostat bulb Bulb of the thermal reset high limit thermostat 95 C Chimney reducing pipe ...

Страница 6: ... Summer Winter switch Switches ON and OFF the heating pump 4 Thermometer The thermometer shows the boiler temperature in the heating circuit This temperature should not exceed 90 C If it does stop the boiler and check the settings on the thermostat If the problem persists contact your installer for advice 5 ACV climatic controller optional Refer to the instructions supplied with the controller if ...

Страница 7: ...ate the boiler s electrical supply at the switch on the external control box before removing the front panel of the casing for press the manual reset high limit thermostat on the top of the boiler Manual reset high limit thermostat Wait until the boiler temperature drops to below 60 C then refit the front panel of the casing If the problem persists please contact your installer for advice Starting...

Страница 8: ...25 35 45 55 F25 F35 F45 F55 G25 G35 G45 G55 A mm 1497 1697 1497 1697 1497 1697 1497 1697 1497 1697 1497 1697 B mm 130 130 150 150 130 130 150 150 130 130 150 150 C mm 360 360 390 390 360 360 390 390 360 360 390 390 D mm 565 565 565 565 818 818 818 848 755 755 755 755 Weight when empty kg 145 156 168 200 157 168 180 212 159 170 182 214 GENERAL The appliances are supplied fully assembled tested and ...

Страница 9: ...0 mm To the rear 150 mm To the sides 100 mm Above 700 mm Base The base on which the boiler will be mounted must be made from non combustible materials Ventilation The boiler room must have both low and high level ventilation By way of information the table below gives the minimum ventilation requirements according to Belgian regulations The user must ensure that his boiler room ventilation complie...

Страница 10: ...and calibrated to 7 bar the group s valve discharge must be connected to the sewer HOT WATER EXPANSION VESSEL Installing a hot water expansion vessel will prevent any risk of excess pressure due to water hammer or pressure fluctuations HOT WATER CIRCULATION If the water tank is a long way from the point of use installing a closed recirculation circuit can ensure a faster hot water drawoff at any t...

Страница 11: ...door sensor 30 50 C a servomotor SQY 349 230 V 3 pin and an intermediate socket CIRCUIT DIAGRAM OF ACV CONTROL KITS B2 Temperature sensor B9 Outdoor sensor B5 Analog digital room sensor P1 Pump Y1 Y2 N Servomotor SSY 319 or SQK 349 bl Blue N n z Black Y2 br Brown Y1 Please contact your installer for further details about this 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 20 19 18 17 16 15 14 ...

Страница 12: ...9 Thermal reset high limit thermostat 95 C B Blue Br Brown Bk Black Or Orange Y Gr Yellow Green The boiler must be isolated from the electrical supply before any work is carried out on it 1 2 C L1 L1 N T1 T2 N T1 T2 S3 S3 S3 B4 N T1 T2 L1 1 4 9 2 3 7 5 8 6 230V 50 Hz 6A Br Bk Bk Br Or Y Gr B Br B Or B Y Gr B Br B Y Gr Br Or Or B Or ELECTRICAL BURNERS CONNECTION PH Phase N Neutral M Motor VM1 Magne...

Страница 13: ...lame by an insulation blanket SETTING OIL BURNER PARAMETERS F25 F35 F45 F55 Burner BM R 31 BM R 31 BM R 51 BM 101 Output kW 12 48 12 48 42 60 55 130 Electrical power W 150 150 150 185 Nozzle gal h 0 6 0 75 0 85 1 50 Nozzle angle 60 60 60 B 60 B Oil flow rate kg h 2 18 2 84 3 60 5 76 Pump pressure bar 11 2 12 0 15 0 10 0 Flue gas index 0 6 0 3 0 4 0 5 Air flap setting 4 5 4 8 4 5 5 0 Combustion head ...

Страница 14: ...charging of the burnt gases the air flow drops and this leads to the same reactions as those described above leading to the burner being shut down locked out SETTING OIL BURNER PARAMETERS G25 G35 G45 G55 Burner BG 2000 S 25 BG 2000 S 35 BG 2000 S 45 BG 2000 S 55 Input kW 25 34 9 45 55 Output kW 22 45 31 35 40 5 49 Combustion efficiency natural gas 91 7 91 5 92 4 92 CO2 natural gas 9 1 9 0 8 9 9 0 C...

Страница 15: ...ctor Ø 3 4 Ionisation electrode Venturi Fan Burner chamber plate insulation Burner chamber plate sealing cord Gas valve Burner chamber plate Flame inspection window Burner tube Potentiometer setting Electrical burner connector Ignition cable Ionisation cable Control monitoring relay ...

Страница 16: ...clean them Replace these items if worn 6 Remove the burner cover and burner E 7 Brush the flue ways D 8 Clean the combustion chamber F and the burner 9 Check the condition of the seal on the burner chamber plate H MAINTENANCE OF BURNER See the technical and maintenance manual of the burner MAINTENANCE OF SAFETY EQUIPMENT Check that all thermostats and safety devices operate correctly boiler thermo...

Страница 17: ...EN 17 COMMISSIONING AND MAINTENANCE 8 8 4 3 1 2 5 6 9 7 4 5 3 11 8 10 6 9 7 5 2 1 F D C E A B G H ...

Страница 18: ...EN 18 ...

Страница 19: ...39 21471339 21471338 21471338 21471339 21471339 A05 21474338 21474338 21474339 21474339 21474338 21474338 21474339 21474339 A06 21475338 21475338 21475338 21475338 21475338 21475338 21475338 21475338 A07 21478338 21478338 21478338 21478338 21478338 21478338 21478338 21478338 A08 21476339 21476338 21476339 21476338 21476339 21476338 21476339 21476338 A09 21477338 21477338 21477338 21477338 21477338...

Страница 20: ...66016 54766016 54766017 54766017 54766017 54766017 54442045 54442045 54442045 54442045 54764021 54764021 54764021 54764021 54763007 54763007 54763007 54763007 54322000 54322000 54322000 54322000 54764010 54764010 54764010 54764010 54428129 54428129 54428129 54428129 49410045 49410045 49410045 49410039 ...

Страница 21: ...F3033 557A0016 557A0016 507F2005 507F2005 507F2005 507F2005 51305000 51305000 51305000 51305000 55426001 55426001 55426001 55426001 63438001 63438001 63438001 63438001 47438008 47438008 47438008 47438008 47405004 47405004 47405004 47405004 47405005 47405005 47405005 47405005 ...

Страница 22: ...F25 F35 F45 F55 BM R 31 237E0009 237E0009 BM R 51 23860600 BM 101 23860200 G25 G35 G45 G55 BG 2000 S 25 237D0063 BG 2000 S 35 237D0066 BG 2000 S 45 237G0065 BG 2000 S 55 237D0013 ...

Страница 23: ...SA TEL 1 856 228 8881 FAX 1 856 228 3584 E MAIL sales triangletube com excellence in hot water www acv world com ARGENTINA TECNOPRACTICA ALFEREZ BOUCHARD 4857 1605 CARAPACHAY BUENOS AIRES TEL 54 11 47 65 33 35 FAX 54 11 47 65 43 07 E MAIL jchas tecnopractica com AUSTRALIA HUNT HEATING PTY LTD 10 GARDEN BOULEVARD 3172 VICTORIA AUSTRALIA TEL 61 3 9558 7077 FAX 61 3 9558 7027 E MAIL enquiries hunthea...

Отзывы: