2.4 Hoisting Cable Rigging and Adjustment
2.3.3
Attach two foot long lead wires (not supplied by
Holophane) to the top terminals of the circuit breaker.
Slide the circuit breaker assembly through the bottom of
the pole and secure with the nuts and bolts provided.
Reattach the cover. Bring the lead wires out of one
side of the cover. These leads will be spliced to the
supply conductors after pole has been erected.
2.3.4
Hook the shackle of the stringing hook over the
U-shaped bail of the clevis and insert the pin. Insert the
other end of the hook into the the tie-off bracket welded
inside the pole. Make sure the clevis pin is secured
with a cotter pin. (See Figure 8) The stringing hook
keeps the clevis from being pulled back up the pole
while rigging the hoisting cables and holds the ring
during pole erection.
HOLOPHANE
High Mast
Lowering Devices
SECTION II
Figure 6
Figure 9
2.4.3
At the top of the pole, orient the LD ring so that
the strain plate mounting hole on the top flange of the
ring aligns with the power cord slot on the headframe.
(See Figure 9)
2.4.4
Insert the free end of each of the hoisting cables
down through its corresponding latch pin on the LD
ring. Be careful not to loop or kink the cables as they
are being pulled through.
GR1135
GR1138
CIRCUIT
BREAKER
CIRCUIT BREAKER CORD
Figure 7
GR1157
LEAD WIRES
(NOT SUP-
PLIED BY
HOLOPHANE)
Figure 8
GR1223
7
Содержание Holophane 15
Страница 6: ...GR1129 4...
Страница 17: ...SINGLE CIRCUIT WIRING DIAGRAMS GR1164 GR1165 GR1166 15...
Страница 18: ...DOUBLE CIRCUIT WIRING DIAGRAMS GR1167 GR1168 16...
Страница 24: ...HOLOPHANE High Mast Lowering Devices SECTION V ATTACHMENTS 22...